IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,698

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0440 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $63 $252 Implemented
KU0440 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,744 $106 Implemented
KU0440 # 07 Y:1994 07 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,217 $1,110 Implemented
KU0440 # 08 Y:1994 08 1994 INSTALL TIMERS AND/OR THERMOSTATS $904 $600 Implemented
KU0440 # 09 Y:1994 09 1994 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $213 $220 Not Implemented
SF0035 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,055 $1,298 Implemented
SF0035 # 02 Y:1994 02 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,720 $21,935 Not Implemented
SF0035 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,368 $900 Implemented
SF0035 # 04 Y:1994 04 1994 INSULATE BARE EQUIPMENT $116,693 $13,400 Not Implemented
SF0035 # 05 Y:1994 05 1994 USE SYNTHETIC LUBRICANT $781 $0 Implemented
SF0035 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,453 $4,943 Implemented
SF0035 # 07 Y:1994 07 1994 RECOVER WASTE HEAT FROM EQUIPMENT $25,360 $12,000 Not Implemented
MA0313 # 01 Y:1994 01 1994 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $16,573 $31,939 Not Implemented
MA0313 # 02 Y:1994 02 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,198 $30,000 Not Implemented
MA0313 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,706 $2,248 Implemented
MA0313 # 04 Y:1994 04 1994 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,203 $28,535 Not Implemented
MA0313 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,374 $180 Implemented
MA0313 # 06 Y:1994 06 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $69,505 $30,000 Implemented
MA0313 # 07 Y:1994 07 1994 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $25,107 $30,000 Not Implemented
MA0313 # 08 Y:1994 08 1994 REDUCE OR ELIMINATE WASTE $386 $500 Implemented
CO0308 # 01 Y:1994 01 1994 INSULATE BARE EQUIPMENT $11,270 $18,000 Not Implemented
CO0308 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,460 $17,520 Not Implemented
CO0308 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,310 $6,080 Not Implemented
CO0308 # 04 Y:1994 04 1994 INSULATE BARE EQUIPMENT $1,520 $2,820 Not Implemented
NC0030 # 01 Y:1994 01 1994 USE OPTIMUM THICKNESS INSULATION $176,704 $52,500 n/a