IAC logo
IAC Assessment: NC0030
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0030
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1994
Principal Product Bricks
NAICS n/a
SIC 3251 - Brick And Structural Clay Tile
Sales $10,000,000-$50,000,000
# of Employees 215
Plant Area (Sq.Ft.) 273,000
Annual Production 120,000,000 Pieces
Production Hrs. Annual 2,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,079,419 19,891,266 kWh $0.05
Natural Gas $178,171 51,555 MMBtu $3.46
Wood $409,834 569,715 MMBtu $0.72
TOTAL ENERGY COSTS $1,667,424
RECOMMENDED SAVINGS* $235,695 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$176,704
Cost:
$52,500
- - $176,704 51,000 -
-
kWh
$176,704
51,000
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$16,871
Cost:
$27,600
$16,871 312,427 - - $16,871
312,427
kWh
-
-
MMBtu
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$26,900
Cost:
$60,000
$26,900 - - - $26,900
-
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$12,452
Cost:
$23,090
$12,452 230,657 - - $12,452
230,657
kWh
-
-
MMBtu
05: 2.5194 REDESIGN PROCESS Savings:
$2,768
Cost:
$782
- - $2,768 832 -
-
kWh
$2,768
832
MMBtu
TOTAL RECOMMENDED Savings:
$235,695
Cost:
$163,972
$56,223 543,084 $179,472 51,832 $56,223
543,084
kWh
$179,472
51,832
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas