IAC logo
IAC Assessment: MA0313
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0313
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1994
Principal Product prestressed concrete
NAICS n/a
SIC 3272 - Concrete Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 282,000
Annual Production 51,000 Thousand Feet
Production Hrs. Annual 3,744
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,358 677,608 kWh $0.10
Natural Gas $53,595 6,987 MMBtu $7.67
TOTAL ENERGY COSTS $119,953
RECOMMENDED SAVINGS* $145,052 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $81,971
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)
$ kWh $ MMBtu $ lb
01: 2.1333 CONVERT COMBUSTION EQUIPMENT TO BURN OIL Savings:
$16,573
Cost:
$31,939
- - $16,573 - - - -
-
kWh
$16,573
-
MMBtu
-
-
lb
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,198
Cost:
$30,000
$12,198 124,560 - - - - $12,198
124,560
kWh
-
-
MMBtu
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,706
Cost:
$2,248
$9,706 99,062 - - - - $9,706
99,062
kWh
-
-
MMBtu
-
-
lb
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$9,203
Cost:
$28,535
$9,203 351,700 - - - - $9,203
351,700
kWh
-
-
MMBtu
-
-
lb
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,374
Cost:
$180
$2,374 26,084 - - - - $2,374
26,084
kWh
-
-
MMBtu
-
-
lb
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$69,505
Cost:
$30,000
- - - - $69,505 174,000 -
-
kWh
-
-
MMBtu
$69,505
174,000
lb
07: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE Savings:
$25,107
Cost:
$30,000
- - - - $25,107 1,900,000 -
-
kWh
-
-
MMBtu
$25,107
1,900,000
lb
08: 3.7214 REDUCE OR ELIMINATE WASTE Savings:
$386
Cost:
$500
- - - - $386 12,480 -
-
kWh
-
-
MMBtu
$386
12,480
lb
TOTAL RECOMMENDED Savings:
$145,052
Cost:
$153,402
$33,481 601,406 $16,573 - $94,998 2,086,480 $33,481
601,406
kWh
$16,573
-
MMBtu
$94,998
2,086,480
lb
TOTAL IMPLEMENTED Savings:
$81,971
Cost:
$32,928
$12,080 125,146 - - $69,891 186,480 $12,080
125,146
kWh
-
-
MMBtu
$69,891
186,480
lb
Savings
Cost
$ kWh $ MMBtu $ lb
Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)