Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1994 |
Principal Product | prestressed concrete |
NAICS | n/a |
SIC | 3272 - Concrete Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 282,000 |
Annual Production | 51,000 Thousand Feet |
Production Hrs. Annual | 3,744 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $66,358 | 677,608 | kWh | $0.10 |
Natural Gas | $53,595 | 6,987 | MMBtu | $7.67 |
TOTAL ENERGY COSTS | $119,953 | |||
RECOMMENDED SAVINGS* | $145,052 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $81,971 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1333 CONVERT COMBUSTION EQUIPMENT TO BURN OIL |
Savings: $16,573 Cost: $31,939 |
- | - | $16,573 | - | - | - |
- - kWh |
$16,573 - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $12,198 Cost: $30,000 |
$12,198 | 124,560 | - | - | - | - |
$12,198 124,560 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $9,706 Cost: $2,248 |
$9,706 | 99,062 | - | - | - | - |
$9,706 99,062 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $9,203 Cost: $28,535 |
$9,203 | 351,700 | - | - | - | - |
$9,203 351,700 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,374 Cost: $180 |
$2,374 | 26,084 | - | - | - | - |
$2,374 26,084 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $69,505 Cost: $30,000 |
- | - | - | - | $69,505 | 174,000 |
- - kWh |
- - MMBtu |
$69,505 174,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE |
Savings: $25,107 Cost: $30,000 |
- | - | - | - | $25,107 | 1,900,000 |
- - kWh |
- - MMBtu |
$25,107 1,900,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.7214 REDUCE OR ELIMINATE WASTE |
Savings: $386 Cost: $500 |
- | - | - | - | $386 | 12,480 |
- - kWh |
- - MMBtu |
$386 12,480 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $145,052 Cost: $153,402 |
$33,481 | 601,406 | $16,573 | - | $94,998 | 2,086,480 | $33,481 601,406 kWh |
$16,573 - MMBtu |
$94,998 2,086,480 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $81,971 Cost: $32,928 |
$12,080 | 125,146 | - | - | $69,891 | 186,480 | $12,080 125,146 kWh |
- - MMBtu |
$69,891 186,480 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Solid Waste (non-haz) |