Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,728
matching recommendationsSIC | 32 | Stone, Clay, And Glass Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1042 # 04 Y:2021 | 04 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $303 | $1,200 | Not Implemented |
IP0144 # 01 Y:2020 | 01 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,556 | $0 | Implemented |
IP0144 # 02 Y:2020 | 02 | 2020 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $2,096 | $0 | Implemented |
IP0144 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,747 | $85 | Implemented |
IP0144 # 04 Y:2020 | 04 | 2020 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $8,469 | $3,263 | Not Implemented |
IP0144 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $194 | $195 | Implemented |
IP0144 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,442 | $22,030 | Implemented |
TT0248 # 01 Y:2021 | 01 | 2021 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $852,090 | $500,000 | Not Implemented |
TT0248 # 02 Y:2021 | 02 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $43,748 | $61,200 | Not Implemented |
TT0248 # 03 Y:2021 | 03 | 2021 | INSULATE BARE EQUIPMENT | $7,421 | $11,190 | Implemented |
SD0603 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,364 | $5,800 | Implemented |
SD0603 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,309 | $3,594 | Implemented |
SD0603 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,802 | $6,300 | Implemented |
SD0603 # 04 Y:2020 | 04 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,190 | $4,000 | Implemented |
CW0116 # 01 Y:2020 | 01 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $342 | $1,350 | Not Implemented |
CW0116 # 02 Y:2020 | 02 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $752 | $70 | Implemented |
CW0116 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $138 | $90 | Implemented |
CW0116 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $46 | $0 | Implemented |
CW0116 # 05 Y:2020 | 05 | 2020 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $4,030 | $19,360 | Not Implemented |
CW0116 # 06 Y:2020 | 06 | 2020 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $3,657 | $2,615 | Not Implemented |
CW0116 # 07 Y:2020 | 07 | 2020 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $438 | $0 | Implemented |
WV0603 # 01 Y:2020 | 01 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $335,278 | $8,838 | Not Implemented |
WV0603 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $153,514 | $84,253 | Not Implemented |
WV0603 # 03 Y:2020 | 03 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $11,834 | $1,018 | Not Implemented |
WV0603 # 04 Y:2020 | 04 | 2020 | INSULATE BARE EQUIPMENT | $10,297 | $13,192 | Not Implemented |