IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,633

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AT0016 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $399 $44 Implemented
AT0016 # 03 Y:1985 03 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $347 $500 Implemented
LT0031 # 01 Y:1985 01 1985 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,755 $1,167 Implemented
LT0031 # 02 Y:1985 02 1985 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $821 $88 Implemented
LT0031 # 03 Y:1985 03 1985 USE OPTIMUM TEMPERATURE $5,175 $15,000 Implemented
CO0029 # 01 Y:1985 01 1985 RECOVER WASTE HEAT FROM EQUIPMENT $6,865 $7,500 Implemented
CO0029 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $76,640 $40,000 Implemented
CO0029 # 03 Y:1985 03 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,884 $76,000 Not Implemented
CO0029 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,236 $0 Implemented
CO0029 # 05 Y:1985 05 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $540 $0 Implemented
GT0256 # 01 Y:1985 01 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $329 $330 Implemented
GT0256 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $195 $75 Not Implemented
GT0256 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $970 $500 Not Implemented
GT0256 # 04 Y:1985 04 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $709 $0 Not Implemented
GT0256 # 05 Y:1985 05 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,330 $640 Implemented
GT0256 # 06 Y:1985 06 1985 INSULATE BARE EQUIPMENT $11,900 $9,650 Implemented
GT0256 # 07 Y:1985 07 1985 USE MINIMUM SAFE OVEN VENTILATION $16,700 $1,000 Not Implemented
CO0023 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,206 $2,724 Not Implemented
CO0023 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $1,114 $380 Not Implemented
CO0023 # 03 Y:1985 03 1985 RECOVER WASTE HEAT FROM EQUIPMENT $6,891 $5,000 Implemented
CO0023 # 04 Y:1985 04 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,690 $375 Implemented
CO0023 # 05 Y:1985 05 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $159 $20 Not Implemented
CO0023 # 06 Y:1985 06 1985 INSTALL TIMERS AND/OR THERMOSTATS $1,957 $10,000 Not Implemented
CO0023 # 07 Y:1985 07 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,364 $100 Implemented
LT0016 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,887 $2,485 Implemented