IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,698

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0231 # 06 Y:2024 06 2024 MAINTAIN MACHINES TO REDUCE LEAKS $441,845 $39,600 Not Implemented
DL0231 # 05 Y:2024 05 2024 MAINTAIN MACHINES TO REDUCE LEAKS $132,876 $34,600 Not Implemented
DL0231 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $25,112 $9,768 Not Implemented
DL0231 # 03 Y:2024 03 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $149,450 $333,800 Not Implemented
DL0231 # 02 Y:2024 02 2024 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $229,694 $2,880,000 Not Implemented
DL0231 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $172,461 $34,600 Not Implemented
UW2317 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $533 $0 Implemented
UW2317 # 02 Y:2023 02 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $658 $1,096 Implemented
UW2317 # 03 Y:2023 03 2023 INSTALL STORM WINDOWS AND DOORS $156 $1,901 Implemented
UW2317 # 04 Y:2023 04 2023 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $31,756 $1,000,000 Implemented
UW2317 # 05 Y:2023 05 2023 IMPROVE COMBUSTION CONTROL CAPABILITY $30,104 $300,000 Implemented
UW2315 # 01 Y:2023 01 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,189 $1,896 Implemented
UW2315 # 02 Y:2023 02 2023 IMPROVE COMBUSTION CONTROL CAPABILITY $30,104 $300,000 Implemented
UW2315 # 03 Y:2023 03 2023 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $1,343 $10,879 Not Implemented
UF0601 # 04 Y:2023 04 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $32,141 $49,680 Implemented
UF0601 # 03 Y:2023 03 2023 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $280,640 $30,000 Implemented
UF0601 # 02 Y:2023 02 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $1,202,647 $3,920,000 Implemented
UF0601 # 01 Y:2023 01 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,858,540 $0 Not Implemented
UF0601 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,983 $0 Implemented
UF0601 # 06 Y:2023 06 2023 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $74,558 $0 Implemented
UF0601 # 07 Y:2023 07 2023 LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA $61,813 $29,295 Implemented
UF0601 # 08 Y:2023 08 2023 IMPROVE SPACE COMFORT CONDITIONING $34,014 $3,179 Implemented
OR0774 # 04 Y:2023 04 2023 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,255 $1,480 Not Implemented
OR0774 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $10,951 $10,710 Not Implemented
OR0774 # 02 Y:2023 02 2023 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $22,803 $17,436 Not Implemented