IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

114

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0453 # 04 Y:1991 04 1991 OPTIMIZE PLANT POWER FACTOR $938 $2,964 Not Implemented
GT0453 # 03 Y:1991 03 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,061 $10,260 Not Implemented
GT0453 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,340 $12,780 Not Implemented
GT0453 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $91 $2,090 Not Implemented
MO0043 # 02 Y:1991 02 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,765 $0 Not Implemented
MO0043 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,499 $0 Not Implemented
MO0043 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $376 $300 Not Implemented
MO0043 # 03 Y:1991 03 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,143 $2,738 Not Implemented
MO0043 # 01 Y:1991 01 1991 RECOVER AND REUSE COOLING WATER $28,978 $0 Not Implemented
MO0043 # 06 Y:1991 06 1991 UPGRADE OBSOLETE EQUIPMENT $2,924 $0 Not Implemented
MO0043 # 07 Y:1991 07 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,518 $416 Not Implemented
UD0354 # 01 Y:1991 01 1991 OPTIMIZE PLANT POWER FACTOR $12,118 $4,375 Implemented
UD0354 # 03 Y:1991 03 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,096 $0 Implemented
UD0354 # 04 Y:1991 04 1991 INSTALL SET-BACK TIMERS $3,907 $0 Implemented
UD0354 # 05 Y:1991 05 1991 INSTALL SET-BACK TIMERS $1,636 $0 Implemented
UD0354 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,516 $0 Implemented
KU0345 # 08 Y:1991 08 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $715 $300 Implemented
KU0345 # 06 Y:1991 06 1991 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,461 $5,300 Implemented
KU0345 # 14 Y:1991 14 1991 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $968 $0 Not Implemented
KU0345 # 09 Y:1991 09 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $536 $60 Implemented
KU0345 # 04 Y:1991 04 1991 REDUCE VENTILATION AIR $1,505 $200 Implemented
KU0345 # 03 Y:1991 03 1991 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,154 $2,200 Implemented
KU0345 # 07 Y:1991 07 1991 RECOVER WASTE HEAT FROM EQUIPMENT $618 $950 Implemented
KU0345 # 11 Y:1991 11 1991 INSTALL SET-BACK TIMERS $796 $950 Implemented
KU0345 # 12 Y:1991 12 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $169 $0 Implemented