Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
203
matching recommendationsSIC | 32 | Stone, Clay, And Glass Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0338 # 02 Y:2002 | 02 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $281 | $0 | Not Implemented |
AS0338 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $392 | $1,387 | Not Implemented |
AS0339 # 05 Y:2002 | 05 | 2002 | INSTALL EQUIPMENT TO MOVE PRODUCT | $40,037 | $40,000 | Not Implemented |
AS0339 # 04 Y:2002 | 04 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $113,273 | $9,000 | Implemented |
AS0339 # 03 Y:2002 | 03 | 2002 | OPTIMIZE PLANT POWER FACTOR | $45,235 | $1,540 | Not Implemented |
AS0339 # 02 Y:2002 | 02 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $286 | $314 | Implemented |
AS0339 # 01 Y:2002 | 01 | 2002 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $393 | $1,000 | Not Implemented |
AS0338 # 06 Y:2002 | 06 | 2002 | INSTALL EQUIPMENT TO MOVE PRODUCT | $20,025 | $38,900 | Not Implemented |
AS0338 # 05 Y:2002 | 05 | 2002 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $875 | $2,400 | Implemented |
AS0338 # 04 Y:2002 | 04 | 2002 | REPLACE BOILER | $1,014 | $2,300 | Not Implemented |
AS0338 # 03 Y:2002 | 03 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $395 | $1,422 | Implemented |
MS0219 # 08 Y:2002 | 08 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,971 | $696 | Implemented |
MS0219 # 09 Y:2002 | 09 | 2002 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $18,200 | $0 | Not Implemented |
MS0219 # 05 Y:2002 | 05 | 2002 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $23,617 | $1,500 | Implemented |
MS0219 # 02 Y:2002 | 02 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $425,529 | $1,452,000 | Not Implemented |
MS0219 # 06 Y:2002 | 06 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $20,902 | $97 | Implemented |
MS0219 # 03 Y:2002 | 03 | 2002 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $67,886 | $1,950 | Implemented |
MS0219 # 07 Y:2002 | 07 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,779 | $1,113 | Implemented |
MS0219 # 04 Y:2002 | 04 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $44,270 | $30,411 | Not Implemented |
MS0219 # 01 Y:2002 | 01 | 2002 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $529,152 | $198,480 | Not Implemented |
WI0433 # 03 Y:2002 | 03 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,530 | $1,000 | Not Implemented |
WI0433 # 02 Y:2002 | 02 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,467 | $20,000 | Implemented |
WI0433 # 04 Y:2002 | 04 | 2002 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,251 | $1,100 | Implemented |
WI0433 # 05 Y:2002 | 05 | 2002 | INSTALL OCCUPANCY SENSORS | $1,228 | $4,000 | Implemented |
WI0433 # 01 Y:2002 | 01 | 2002 | CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING | $14,150 | $13,000 | Implemented |