IAC Assessment: WI0433
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0433
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2002
Principal Product Architectural Glass
NAICS n/a
SIC 3231 - Products Of Purchased Glass
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 44,000
Annual Production 2,225 Thousand Feet
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $148,504 6,957,600 kWh $0.02
Electricity Demand $141,439 14,306 kW-months/year $9.89
Electricity Fees $55,568 - $ -
Natural Gas $4,583 793 MMBtu $5.78
TOTAL ENERGY COSTS $387,210
RECOMMENDED SAVINGS* $32,431 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,615
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 3.1193 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING Savings:
$14,150
Cost:
$13,000
$(-1,200) (-47,058) - - - - $18,600 1,860,000 $(-3,250) - $(-1,200)
(-47,058)
kWh
-
-
kW-months/year
-
-
MMBtu
$18,600
1,860,000
Tgal
$(-3,250)
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,467
Cost:
$20,000
$9,467 420,744 - - - - - - - - $9,467
420,744
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$4,530
Cost:
$1,000
$4,028 179,040 $8,402 805 $(-7,900) (-1,366) - - - - $4,028
179,040
kWh
$8,402
805
kW-months/year
$(-7,900)
(-1,366)
MMBtu
-
-
Tgal
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,251
Cost:
$1,100
- - - - $2,251 389 - - - - -
-
kWh
-
-
kW-months/year
$2,251
389
MMBtu
-
-
Tgal
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,228
Cost:
$4,000
$528 23,499 $700 67 - - - - - - $528
23,499
kWh
$700
67
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$519
Cost:
$740
$321 14,301 $198 19 - - - - - - $321
14,301
kWh
$198
19
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$286
Cost:
$800
- - - - $286 49 - - - - -
-
kWh
-
-
kW-months/year
$286
49
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$32,431
Cost:
$40,640
$13,144 590,526 $9,300 891 $(-5,363) (-928) $18,600 1,860,000 $(-3,250) - $13,144
590,526
kWh
$9,300
891
kW-months/year
$(-5,363)
(-928)
MMBtu
$18,600
1,860,000
Tgal
$(-3,250)
-
$
TOTAL IMPLEMENTED Savings:
$27,615
Cost:
$38,840
$9,116 411,486 $898 86 $2,251 389 $18,600 1,860,000 $(-3,250) - $9,116
411,486
kWh
$898
86
kW-months/year
$2,251
389
MMBtu
$18,600
1,860,000
Tgal
$(-3,250)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes