Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
52
matching recommendationsSIC | 32 | Stone, Clay, And Glass Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0346 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,314 | $12,874 | Implemented |
MS0346 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,932 | $401 | Implemented |
MS0346 # 03 Y:2009 | 03 | 2009 | INSTALL OCCUPANCY SENSORS | $9,234 | $4,004 | Implemented |
MS0346 # 02 Y:2009 | 02 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $23,121 | $2,882 | Implemented |
MS0346 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,889 | $39,913 | Not Implemented |
LE0293 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,797 | $1,800 | Implemented |
LE0293 # 03 Y:2009 | 03 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,105 | $2,932 | Implemented |
LE0293 # 04 Y:2009 | 04 | 2009 | INSTALL OCCUPANCY SENSORS | $2,864 | $700 | Implemented |
LE0293 # 05 Y:2009 | 05 | 2009 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,697 | $27,600 | Implemented |
LE0293 # 06 Y:2009 | 06 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $717 | $1,675 | Implemented |
LE0293 # 07 Y:2009 | 07 | 2009 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $356 | $2,250 | Not Implemented |
LE0293 # 08 Y:2009 | 08 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,196 | $58,455 | Implemented |
LE0293 # 01 Y:2009 | 01 | 2009 | USE BATCH FIRING WITH KILN "FURNITURE" SPECIFICALLY DESIGNED | $25,144 | $15,000 | Implemented |
NC0393 # 01 Y:2009 | 01 | 2009 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $32,824 | $74,000 | Not Implemented |
NC0393 # 02 Y:2009 | 02 | 2009 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $31,650 | $1,000 | Implemented |
NC0393 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $967 | $2,795 | Implemented |
NC0393 # 03 Y:2009 | 03 | 2009 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $6,020 | $2,216 | Implemented |
NC0393 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $256 | $100 | Implemented |
WV0391 # 10 Y:2009 | 10 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $374 | $300 | Implemented |
WV0391 # 04 Y:2009 | 04 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,238 | $8,890 | Not Implemented |
WV0391 # 06 Y:2009 | 06 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,483 | $105 | Implemented |
WV0391 # 05 Y:2009 | 05 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,896 | $8,900 | Not Implemented |
WV0391 # 03 Y:2009 | 03 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11,520 | $800 | Implemented |
WV0391 # 07 Y:2009 | 07 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,782 | $8,543 | Not Implemented |
WV0391 # 02 Y:2009 | 02 | 2009 | USE PHOTOCELL CONTROLS | $11,811 | $6,850 | Not Implemented |