IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

458

matching recommendations
Reset
SIC 322 Glass And Glassware, Pressed Or Blown
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0186 # 02 Y:2000 02 2000 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $3,993 $6,400 Not Implemented
NC0186 # 03 Y:2000 03 2000 USE OPTIMUM THICKNESS INSULATION $9,327 $32,175 Not Implemented
NC0186 # 04 Y:2000 04 2000 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $12,321 $4,000 Implemented
NC0186 # 05 Y:2000 05 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,150 $200 Not Implemented
AM0368 # 01 Y:2000 01 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,224,000 $234,000 Not Implemented
AM0368 # 02 Y:2000 02 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $339,020 $481,000 Not Implemented
AM0368 # 03 Y:2000 03 2000 REDUCE SCRAP PRODUCTION $327,000 $45,000 Not Implemented
AM0368 # 04 Y:2000 04 2000 MODIFY MATERIAL APPLICATION METHODS $207,000 $0 Not Implemented
AM0368 # 05 Y:2000 05 2000 PURCHASE EQUIPMENT INSTEAD OF LEASING $131,000 $317,000 Not Implemented
AM0368 # 06 Y:2000 06 2000 REDUCE SCRAP PRODUCTION $54,000 $120,000 Not Implemented
AM0368 # 07 Y:2000 07 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $85,560 $3,500 Not Implemented
AM0368 # 08 Y:2000 08 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $85,000 $100,000 Not Implemented
AM0368 # 09 Y:2000 09 2000 TREAT AND REUSE RINSE WATERS $80,300 $242,500 Implemented
AM0368 # 10 Y:2000 10 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $72,000 $68,000 Implemented
AM0368 # 11 Y:2000 11 2000 USE RADIANT HEATER FOR SPOT HEATING $72,000 $26,400 Not Implemented
AM0368 # 12 Y:2000 12 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $10,591 $0 Implemented
AM0368 # 13 Y:2000 13 2000 USE SYNTHETIC LUBRICANT $10,060 $0 Not Implemented
AM0368 # 14 Y:2000 14 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $8,800 $0 Not Implemented
AM0368 # 15 Y:2000 15 2000 LOWER OPERATING PRESSURE OF CONDENSER (STEAM) $3,400 $0 Not Implemented
AM0368 # 16 Y:2000 16 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,040 $1,500 Implemented
AM0368 # 17 Y:2000 17 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,070 $3,400 Implemented
WV0175 # 01 Y:1999 01 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $177 $200 Not Implemented
WV0175 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $332 $204 Not Implemented
WV0175 # 03 Y:1999 03 1999 REPAIR OR REPLACE STEAM TRAPS $426,829 $88,360 Implemented
WV0175 # 04 Y:1999 04 1999 OPTIMIZE PLANT POWER FACTOR $14,700 $14,700 Implemented