Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
18
matching recommendationsSIC | 322 | Glass And Glassware, Pressed Or Blown |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0629 # 08 Y:2019 | 08 | 2019 | AVOID REWINDING MOTORS MORE THAN TWICE | $11,808 | $25,282 | Not Implemented |
NC0629 # 07 Y:2019 | 07 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $35,842 | $115,000 | Not Implemented |
NC0629 # 06 Y:2019 | 06 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $329 | $250 | Not Implemented |
NC0629 # 05 Y:2019 | 05 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,460 | $1,000 | Not Implemented |
NC0629 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,371 | $5,000 | Not Implemented |
NC0629 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $281 | $750 | Not Implemented |
NC0629 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,106 | $100 | Not Implemented |
NC0629 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,243 | $610 | Implemented |
NC0356 # 05 Y:2007 | 05 | 2007 | USE PHOTOCELL CONTROLS | $798 | $500 | Not Implemented |
NC0356 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,456 | $100 | Implemented |
NC0356 # 03 Y:2007 | 03 | 2007 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $11,040 | $13,725 | Not Implemented |
NC0356 # 02 Y:2007 | 02 | 2007 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $20,393 | $10,000 | Implemented |
NC0356 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,291 | $30,000 | Not Implemented |
NC0186 # 01 Y:2000 | 01 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,878 | $20 | Not Implemented |
NC0186 # 05 Y:2000 | 05 | 2000 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $1,150 | $200 | Not Implemented |
NC0186 # 04 Y:2000 | 04 | 2000 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $12,321 | $4,000 | Implemented |
NC0186 # 03 Y:2000 | 03 | 2000 | USE OPTIMUM THICKNESS INSULATION | $9,327 | $32,175 | Not Implemented |
NC0186 # 02 Y:2000 | 02 | 2000 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $3,993 | $6,400 | Not Implemented |