IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

113

matching recommendations
Reset
SIC 3221 Glass Containers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0145 # 01 Y:2014 01 2014 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $89,896 $277,500 Not Implemented
MZ0145 # 08 Y:2014 08 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,868 $0 Implemented
MZ0145 # 04 Y:2014 04 2014 UPGRADE CONTROLS ON COMPRESSORS $113,101 $200,000 Implemented
MZ0145 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $629 $1,000 Not Implemented
MZ0145 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $105,420 $300,000 Implemented
MZ0145 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $192,210 $220,000 Implemented
UW0028 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $12,524 $1,960 Implemented
UW0028 # 06 Y:2009 06 2009 METER WASTE WATER $1,060 $12,000 Implemented
UW0028 # 07 Y:2009 07 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $847 $560 Not Implemented
UW0028 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,942 $76,700 Implemented
UW0028 # 02 Y:2009 02 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $323,442 $485,164 Not Implemented
UW0028 # 01 Y:2009 01 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,467,516 $2,201,270 Not Implemented
UW0028 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $144 $0 Implemented
UW0028 # 05 Y:2009 05 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,663 $31,539 Not Implemented
OR0531 # 02 Y:2008 02 2008 OPTIMIZE PLANT POWER FACTOR $20,000 $87,500 Not Implemented
OR0531 # 03 Y:2008 03 2008 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $2,400 $0 Not Implemented
OR0531 # 05 Y:2008 05 2008 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $32,266 $3,000 Not Implemented
OR0531 # 04 Y:2008 04 2008 CLEAR AND RENT EXISTING SPACE $24,000 $0 Not Implemented
OR0531 # 01 Y:2008 01 2008 INSTALL OCCUPANCY SENSORS $2,818 $2,800 Not Implemented
CO0582 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,630 $180 Implemented
CO0582 # 05 Y:2006 05 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $869 $736 Implemented
CO0582 # 06 Y:2006 06 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $1,380 $1,150 Implemented
CO0582 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,610 $80,000 Implemented
CO0582 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,080 $24,410 Not Implemented
CO0582 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,090 $5,050 Not Implemented