IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 3229 Pressed And Blown Glass, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0533 # 11 Y:1994 11 1994 CONVERT TO AQUEOUS CLEANING SYSTEM $3,325 $3,000 Implemented
TN0533 # 08 Y:1994 08 1994 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $34,098 $45,100 Implemented
TN0533 # 07 Y:1994 07 1994 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $56,576 $32,240 Implemented
TN0533 # 06 Y:1994 06 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,523 $3,350 Implemented
TN0533 # 04 Y:1994 04 1994 INSTALL TIMERS AND/OR THERMOSTATS $1,318 $700 Implemented
TN0533 # 02 Y:1994 02 1994 INSULATE BARE EQUIPMENT $4,449 $200 Implemented
TN0496 # 02 Y:1993 02 1993 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $3,057 $0 Implemented
TN0496 # 07 Y:1993 07 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $603 $0 Implemented
TN0496 # 05 Y:1993 05 1993 INSTALL TIMERS AND/OR THERMOSTATS $1,353 $4,000 Implemented
TN0496 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,000 $820 Implemented
TN0496 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,105 $1,254 Implemented
TN0363 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $125,794 $1,200 Implemented
TN0364 # 05 Y:1989 05 1989 CLOSE OFF UNNEEDED STEAM LINES $3,036 $0 Implemented
TN0364 # 04 Y:1989 04 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,471 $800 Implemented
TN0364 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $139,595 $0 Implemented
TN0363 # 08 Y:1989 08 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,085 $600 Implemented
TN0363 # 07 Y:1989 07 1989 INSTALL SET-BACK TIMERS $2,215 $0 Implemented
TN0363 # 06 Y:1989 06 1989 KEEP LAMPS AND REFLECTORS CLEAN $6,829 $21,293 Implemented
TN0363 # 05 Y:1989 05 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,789 $7,480 Implemented
TN0363 # 04 Y:1989 04 1989 USE MINIMUM STEAM OPERATING PRESSURE $3,504 $0 Implemented
TN0363 # 03 Y:1989 03 1989 INSTALL STEAM TRAP $8,302 $3,450 Implemented
TN0363 # 02 Y:1989 02 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $57,307 $379,000 Implemented