IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 3229 Pressed And Blown Glass, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0693 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,651 $88,297 Not Implemented
OK0693 # 03 Y:2004 03 2004 OPTIMIZE PLANT POWER FACTOR $7,010 $10,720 n/a
OK0693 # 04 Y:2004 04 2004 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $2,179 $3,635 Not Implemented
OK0693 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,903 $31,913 Implemented
OK0693 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $808 $123 Not Implemented
OK0693 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $992 $1,025 Not Implemented
OK0693 # 08 Y:2004 08 2004 INSTALL TIMERS AND/OR THERMOSTATS $772 $1,140 Implemented
OK0693 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $356 $737 Implemented
OK0693 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $585,281 $30,200 Not Implemented
SU0182 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $2,158 $1,678 Not Implemented
SU0182 # 04 Y:2004 04 2004 USE SYNTHETIC LUBRICANT $3,517 $1,200 Implemented
SU0182 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,773 $381 Implemented
SU0182 # 02 Y:2004 02 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $174 $0 Implemented
SU0182 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $26,427 $0 Not Implemented
SF0276 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,720 $14,141 Not Implemented
SF0276 # 07 Y:2004 07 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $15,039 $7,370 Not Implemented
SF0276 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $977 $3,120 Not Implemented
SF0276 # 04 Y:2004 04 2004 UTILIZE A LESS EXPENSIVE COOLING METHOD $55,744 $58,875 n/a
SF0276 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,158 $18,940 n/a
SF0276 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $51,751 $27,610 Not Implemented
SF0276 # 01 Y:2004 01 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,352 $565 Not Implemented