IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 3229 Pressed And Blown Glass, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0238 # 12 Y:2006 12 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,004 $67,500 Not Implemented
SU0238 # 11 Y:2006 11 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $378 $684 Not Implemented
SU0238 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $86 $127 Implemented
SU0238 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $477 $730 Implemented
SU0238 # 08 Y:2006 08 2006 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,018 $1,094 Not Implemented
SU0238 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,210 $264 Implemented
SU0238 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,073 $578 Implemented
SU0238 # 05 Y:2006 05 2006 DISCONNECT BALLASTS $788 $0 Implemented
SU0238 # 04 Y:2006 04 2006 USE SYNTHETIC LUBRICANT $1,534 $0 Not Implemented
SU0238 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,431 $0 Not Implemented
SU0238 # 02 Y:2006 02 2006 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $55,282 $0 Implemented
SU0238 # 01 Y:2006 01 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $98,366 $0 Implemented
NC0337 # 14 Y:2006 14 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,138 $200 Not Implemented
NC0337 # 01 Y:2006 01 2006 REDUCE VENTILATION AIR $92,067 $50,000 Not Implemented
NC0337 # 13 Y:2006 13 2006 ADD AREA LIGHTING SWITCHES $524 $1,200 Not Implemented
NC0337 # 12 Y:2006 12 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,986 $50 Implemented
NC0337 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,266 $3,139 Implemented
NC0337 # 10 Y:2006 10 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $846 $700 Implemented
NC0337 # 09 Y:2006 09 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,941 $0 Not Implemented
NC0337 # 08 Y:2006 08 2006 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $16,069 $19,441 Not Implemented
NC0337 # 07 Y:2006 07 2006 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $23,249 $11,746 Not Implemented
NC0337 # 06 Y:2006 06 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,350 $3,430 Not Implemented
NC0337 # 05 Y:2006 05 2006 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $10,650 $5,000 Not Implemented
NC0337 # 04 Y:2006 04 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $723 $723 Implemented
NC0337 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $9,180 $18,000 Implemented