IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

740

matching recommendations
Reset
SIC 3231 Products Of Purchased Glass
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0161 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,357 $700 Not Implemented
LE0161 # 04 Y:2003 04 2003 INSULATE BARE EQUIPMENT $17,796 $6,000 Implemented
LE0161 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,814 $0 Implemented
WI0433 # 01 Y:2002 01 2002 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING $14,150 $13,000 Implemented
WI0433 # 02 Y:2002 02 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,467 $20,000 Implemented
WI0433 # 03 Y:2002 03 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,530 $1,000 Not Implemented
WI0433 # 04 Y:2002 04 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,251 $1,100 Implemented
WI0433 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $1,228 $4,000 Implemented
WI0433 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $519 $740 Implemented
WI0433 # 07 Y:2002 07 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $286 $800 Not Implemented
OR0417 # 01 Y:2002 01 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $26,500 $0 Not Implemented
OR0417 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,232 $0 Implemented
OR0417 # 03 Y:2002 03 2002 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $6,232 $900 Implemented
OR0417 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,086 $19,050 n/a
OR0417 # 05 Y:2002 05 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,731 $1,800 Implemented
OR0417 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,389 $26,990 Implemented
AS0303 # 01 Y:2001 01 2001 INSTALL SKYLIGHTS $2,313 $9,960 n/a
AS0303 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $500 $60 n/a
AS0303 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $418 $1,425 n/a
AS0303 # 04 Y:2001 04 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $98 $89 n/a
AS0303 # 05 Y:2001 05 2001 METER WASTE WATER $11,634 $1,300 n/a
AS0303 # 06 Y:2001 06 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,620 $60 n/a
AS0303 # 07 Y:2001 07 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,604 $60 n/a
AS0303 # 08 Y:2001 08 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $240 $30 n/a
AS0303 # 09 Y:2001 09 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $37,500 $456 n/a