IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

740

matching recommendations
Reset
SIC 3231 Products Of Purchased Glass
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0303 # 10 Y:2001 10 2001 EXPAND OPERATIONS INTO UNUSED SPACE $280,143 $6,204 n/a
UD0614 # 01 Y:2001 01 2001 INCREASE USE OF AUTOMATION $277,500 $100,000 Not Implemented
UD0614 # 02 Y:2001 02 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $53,184 $30,570 Implemented
UD0614 # 03 Y:2001 03 2001 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $11,618 $23,000 Not Implemented
UD0614 # 04 Y:2001 04 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,036 $0 Not Implemented
UD0614 # 05 Y:2001 05 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $6,252 $0 Implemented
NC0185 # 01 Y:2000 01 2000 ADJUST BURNERS FOR EFFICIENT OPERATION $637 $800 Implemented
NC0185 # 02 Y:2000 02 2000 RECOVER WASTE HEAT FROM EQUIPMENT $537 $1,700 Not Implemented
NC0185 # 03 Y:2000 03 2000 DISCONNECT BALLASTS $441 $500 Implemented
NC0185 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,808 $4,950 Not Implemented
NC0185 # 05 Y:2000 05 2000 USE OPTIMUM THICKNESS INSULATION $4,274 $1,200 Implemented
NC0185 # 06 Y:2000 06 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,584 $50 Implemented
NC0185 # 07 Y:2000 07 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $112 $90 Not Implemented
NC0185 # 08 Y:2000 08 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $4,750 $1,000 Implemented
NC0185 # 09 Y:2000 09 2000 IMPROVE SPACE COMFORT CONDITIONING $143,125 $27,000 Not Implemented
CO0460 # 01 Y:2000 01 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,940 $7,500 Implemented
CO0460 # 02 Y:2000 02 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $540 $250 Not Implemented
CO0460 # 03 Y:2000 03 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $530 $750 Not Implemented
CO0460 # 04 Y:2000 04 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $430 $670 Implemented
CO0460 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $240 $600 Implemented
CO0460 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $200 $210 Implemented
CO0460 # 07 Y:2000 07 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $200 $0 Not Implemented
CO0460 # 08 Y:2000 08 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $166,400 $40,000 Implemented
CO0460 # 09 Y:2000 09 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $72,730 $122,000 Implemented
UF0243 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,393 $0 Implemented