Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsSIC | 3231 | Products Of Purchased Glass |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0003 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,369 | $319,999 | Implemented |
SJ0003 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $103 | $218 | Implemented |
SJ0003 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,596 | $5,020 | Implemented |
SJ0003 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $326 | $20 | Implemented |
SJ0003 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $960 | $2,889 | Implemented |
SD0602 # 01 Y:2020 | 01 | 2020 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,957 | $7,500 | Not Implemented |
SD0602 # 02 Y:2020 | 02 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,346 | $568 | Not Implemented |
SD0602 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,898 | $2,500 | Implemented |
SD0602 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,430 | $10,300 | Not Implemented |
SD0602 # 05 Y:2020 | 05 | 2020 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,177 | $0 | Not Implemented |
SD0602 # 06 Y:2020 | 06 | 2020 | REDUCE SCRAP PRODUCTION | $68,040 | $68,000 | Not Implemented |
LM0077 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $117 | $0 | Implemented |
LM0077 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $997 | $1,920 | Not Implemented |
LM0077 # 05 Y:2004 | 05 | 2004 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $812 | $0 | Implemented |
LM0077 # 04 Y:2004 | 04 | 2004 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $36,400 | $8,800 | Not Implemented |
LM0077 # 03 Y:2004 | 03 | 2004 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $91 | $100 | Implemented |
LM0077 # 01 Y:2004 | 01 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,750 | $3,825 | Not Implemented |
SF0175 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,293 | $3,150 | Implemented |
SF0175 # 02 Y:1999 | 02 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,834 | $3,195 | Not Implemented |
SF0175 # 03 Y:1999 | 03 | 1999 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $769 | $466 | Not Implemented |
SF0175 # 06 Y:1999 | 06 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,802 | $14,510 | Not Implemented |
SF0175 # 07 Y:1999 | 07 | 1999 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $1,413 | $0 | Implemented |
SF0175 # 08 Y:1999 | 08 | 1999 | INSTALL SENSORS TO DETECT DEFECTS | $821,093 | $48,500 | Implemented |
SF0175 # 09 Y:1999 | 09 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $131,976 | $10,000 | Implemented |
SF0175 # 11 Y:1999 | 11 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $54,584 | $130,000 | Not Implemented |