IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 3231 Products Of Purchased Glass
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1037 # 04 Y:2022 04 2022 INSTALL AUTOMATIC STACK DAMPER $4,890 $2,000 Not Implemented
UD1037 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,378 $0 Not Implemented
UD1037 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,459 $0 Not Implemented
UD1037 # 03 Y:2022 03 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,323 $0 Implemented
UD1037 # 05 Y:2022 05 2022 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $26,903 $30,000 Not Implemented
UD1037 # 06 Y:2022 06 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $657 $1,500 Not Implemented
UD1037 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,245 $0 Not Implemented
UD1037 # 08 Y:2022 08 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,275 $14,400 Implemented
UD1037 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,006 $6,975 Implemented
UD0614 # 01 Y:2001 01 2001 INCREASE USE OF AUTOMATION $277,500 $100,000 Not Implemented
UD0614 # 02 Y:2001 02 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $53,184 $30,570 Implemented
UD0614 # 03 Y:2001 03 2001 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $11,618 $23,000 Not Implemented
UD0614 # 04 Y:2001 04 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,036 $0 Not Implemented
UD0614 # 05 Y:2001 05 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $6,252 $0 Implemented
UM0147 # 02 Y:1999 02 1999 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,796 $2,000 Not Implemented
UM0147 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,038 $3,557 Not Implemented
UM0147 # 04 Y:1999 04 1999 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $7,215 $10,000 Not Implemented
UM0147 # 06 Y:1999 06 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $990 $400 Not Implemented
UM0147 # 03 Y:1999 03 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $19,748 $500 Not Implemented
UM0147 # 05 Y:1999 05 1999 RECOVER AND REUSE WASTE MATERIAL $1,436 $0 Implemented
UD0409 # 03 Y:1993 03 1993 INSTALL TIMERS AND/OR THERMOSTATS $1,251 $450 Implemented
UD0409 # 02 Y:1993 02 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $676 $2,471 Implemented
UD0409 # 01 Y:1993 01 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,772 $0 Not Implemented
WV0010 # 07 Y:1993 07 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $182 $11,930 Implemented
WV0010 # 02 Y:1993 02 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,130 $5,200 Not Implemented