IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 3231 Products Of Purchased Glass
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0185 # 09 Y:2000 09 2000 IMPROVE SPACE COMFORT CONDITIONING $143,125 $27,000 Not Implemented
NC0185 # 08 Y:2000 08 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $4,750 $1,000 Implemented
NC0185 # 07 Y:2000 07 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $112 $90 Not Implemented
NC0185 # 06 Y:2000 06 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,584 $50 Implemented
NC0185 # 05 Y:2000 05 2000 USE OPTIMUM THICKNESS INSULATION $4,274 $1,200 Implemented
NC0185 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,808 $4,950 Not Implemented
NC0185 # 03 Y:2000 03 2000 DISCONNECT BALLASTS $441 $500 Implemented
NC0185 # 02 Y:2000 02 2000 RECOVER WASTE HEAT FROM EQUIPMENT $537 $1,700 Not Implemented
NC0185 # 01 Y:2000 01 2000 ADJUST BURNERS FOR EFFICIENT OPERATION $637 $800 Implemented
CO0460 # 02 Y:2000 02 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $540 $250 Not Implemented
CO0460 # 09 Y:2000 09 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $72,730 $122,000 Implemented
CO0460 # 08 Y:2000 08 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $166,400 $40,000 Implemented
CO0460 # 07 Y:2000 07 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $200 $0 Not Implemented
CO0460 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $200 $210 Implemented
CO0460 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $240 $600 Implemented
CO0460 # 04 Y:2000 04 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $430 $670 Implemented
CO0460 # 03 Y:2000 03 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $530 $750 Not Implemented
CO0460 # 01 Y:2000 01 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,940 $7,500 Implemented
UF0243 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,393 $0 Implemented
UF0243 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,494 $0 Implemented
UF0243 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $629 $0 Not Implemented
UF0243 # 04 Y:2000 04 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24,816 $0 Implemented
UF0243 # 05 Y:2000 05 2000 OPTIMIZE PLANT POWER FACTOR $2,493 $0 Implemented
UF0243 # 06 Y:2000 06 2000 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $17,680 $0 Implemented