IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 3231 Products Of Purchased Glass
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0365 # 08 Y:2005 08 2005 IMPROVE SPACE COMFORT CONDITIONING $2,528 $8,978 Implemented
UF0365 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,236 $6,602 Not Implemented
UF0365 # 06 Y:2005 06 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,277 $0 Implemented
UF0365 # 05 Y:2005 05 2005 ADD AREA LIGHTING SWITCHES $1,633 $6,615 Not Implemented
UF0365 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,178 $565 Implemented
UF0365 # 03 Y:2005 03 2005 INSTALL SKYLIGHTS $3,628 $9,645 Not Implemented
UF0365 # 02 Y:2005 02 2005 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $3,910 $1,245 Not Implemented
UF0365 # 01 Y:2005 01 2005 USE PHOTOCELL CONTROLS $4,861 $2,070 Not Implemented
MI0112 # 03 Y:2005 03 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $19,066 $8,226 Implemented
MI0112 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,504 $1,393 Implemented
MI0112 # 04 Y:2005 04 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,289 $600 Implemented
MI0112 # 02 Y:2005 02 2005 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $89,581 $90 Implemented
MI0112 # 01 Y:2005 01 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $319,237 $91,320 Not Implemented
IA0365 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $779 $19 Implemented
IA0365 # 01 Y:2005 01 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,317 $50 Implemented
IA0365 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,995 $3,000 Implemented
IA0365 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $1,148 $1,001 Not Implemented
IA0365 # 05 Y:2005 05 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $628 $1,600 Implemented
IA0365 # 06 Y:2005 06 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $1,000,000 $152,672 Implemented
IA0365 # 07 Y:2005 07 2005 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $11,495 $14,000 Not Implemented
IA0365 # 08 Y:2005 08 2005 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $21,000 $7,216 Implemented
OR0482 # 04 Y:2005 04 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,526 $0 Implemented
OR0482 # 03 Y:2005 03 2005 COMBINE UTILITY METERS $1,500 $4,000 Not Implemented
OR0482 # 02 Y:2005 02 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $60,800 $101,000 Not Implemented
OR0482 # 01 Y:2005 01 2005 MODIFY CURRENT INCENTIVE PROGRAM $220,500 $33,360 Not Implemented