Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
18
matching recommendationsSIC | 3241 | Cement, Hydraulic |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0464 # 05 Y:1996 | 05 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,643 | $9,918 | Implemented |
KU0464 # 04 Y:1996 | 04 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $17,327 | $3,877 | Implemented |
KU0464 # 03 Y:1996 | 03 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,993 | $10,657 | Implemented |
KU0464 # 02 Y:1996 | 02 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $65,015 | $163,148 | Implemented |
KU0464 # 01 Y:1996 | 01 | 1996 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $785,416 | $3,675,000 | Implemented |
KU0169 # 13 Y:1985 | 13 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,374 | $580 | Implemented |
KU0169 # 16 Y:1985 | 16 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $549 | $660 | Implemented |
KU0169 # 15 Y:1985 | 15 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $598 | $50 | Implemented |
KU0169 # 14 Y:1985 | 14 | 1985 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $605 | $0 | Implemented |
KU0169 # 02 Y:1985 | 02 | 1985 | INSULATE BARE EQUIPMENT | $48,005 | $6,000 | Implemented |
KU0169 # 12 Y:1985 | 12 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,444 | $550 | Implemented |
KU0169 # 09 Y:1985 | 09 | 1985 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,472 | $500 | Implemented |
KU0169 # 08 Y:1985 | 08 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,579 | $0 | Implemented |
KU0169 # 07 Y:1985 | 07 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $4,581 | $1,700 | Implemented |
KU0169 # 06 Y:1985 | 06 | 1985 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $7,219 | $13,000 | Implemented |
KU0169 # 05 Y:1985 | 05 | 1985 | INSTALL SET-BACK TIMERS | $8,360 | $622 | Implemented |
KU0169 # 04 Y:1985 | 04 | 1985 | OPTIMIZE PLANT POWER FACTOR | $7,711 | $37,000 | Implemented |
KU0169 # 03 Y:1985 | 03 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $13,083 | $5,000 | Implemented |