IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

592

matching recommendations
Reset
SIC 325 Structural Clay Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0256 # 06 Y:1985 06 1985 INSULATE BARE EQUIPMENT $11,900 $9,650 Implemented
GT0256 # 07 Y:1985 07 1985 USE MINIMUM SAFE OVEN VENTILATION $16,700 $1,000 Not Implemented
TN0230 # 01 Y:1984 01 1984 USE OPTIMUM THICKNESS INSULATION $3,915 $11,018 Implemented
TN0230 # 02 Y:1984 02 1984 REDUCE FLUID FLOW RATES $9,120 $4,000 Not Implemented
TN0230 # 03 Y:1984 03 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $491 $0 Not Implemented
OK0106 # 01 Y:1983 01 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $35,511 $1,133 Implemented
OK0106 # 02 Y:1983 02 1983 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $99 $148 Not Implemented
OK0106 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $109 $73 Implemented
OK0106 # 04 Y:1983 04 1983 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,552 $3,810 Implemented
OK0106 # 09 Y:1983 09 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,084 $2,528 Implemented
OK0106 # 10 Y:1983 10 1983 USE UTILITY CONTROLLED POWER MANAGEMENT $6,953 $0 Implemented
OK0106 # 11 Y:1983 11 1983 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $68 $0 Implemented
OK0106 # 12 Y:1983 12 1983 USE OPTIMUM THICKNESS INSULATION $28,546 $6,480 Implemented
OK0099 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $125 $143 Not Implemented
OK0099 # 02 Y:1983 02 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $215 $600 Not Implemented
OK0099 # 03 Y:1983 03 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,530 $3,400 Not Implemented
OK0099 # 04 Y:1983 04 1983 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $145 $498 Not Implemented
OK0099 # 05 Y:1983 05 1983 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $393 $52 Not Implemented
OK0099 # 06 Y:1983 06 1983 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $548 $25 Not Implemented
OK0099 # 07 Y:1983 07 1983 REDESIGN PROCESS $3,330 $6,464 Not Implemented
OK0099 # 08 Y:1983 08 1983 INSULATE BARE EQUIPMENT $4,569 $2,544 Not Implemented
OK0099 # 09 Y:1983 09 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,219 $70 Not Implemented
OK0067 # 01 Y:1982 01 1982 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $13,100 $40,311 Not Implemented
OK0067 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $63,919 $3,400 Implemented
OK0067 # 03 Y:1982 03 1982 INSULATE BARE EQUIPMENT $5,689 $2,430 Implemented