IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

268

matching recommendations
Reset
SIC 3251 Brick And Structural Clay Tile
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2312 # 02 Y:2023 02 2023 INSTALL TIMERS AND/OR THERMOSTATS $136 $50 n/a
LS2312 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $162 $250 n/a
LS2312 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $194 $25 n/a
LS2312 # 05 Y:2023 05 2023 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $15,360 $50,040 n/a
LS2312 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $563 $525 n/a
SD0603 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,364 $5,800 Implemented
SD0603 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,309 $3,594 Implemented
SD0603 # 04 Y:2020 04 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,190 $4,000 Implemented
SD0603 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,802 $6,300 Implemented
NL0038 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,352 $25,229 Not Implemented
NL0038 # 04 Y:2019 04 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,391 $31,162 Not Implemented
NL0038 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,806 $4,500 Not Implemented
NL0038 # 01 Y:2019 01 2019 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,358 $20,000 Not Implemented
LE0461 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,358 $92,947 Not Implemented
LE0461 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,938 $500 Not Implemented
LE0461 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,308 $200,000 Not Implemented
LE0461 # 04 Y:2018 04 2018 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $221,077 $850,000 Not Implemented
LE0461 # 03 Y:2018 03 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,854 $9,000 Not Implemented
LE0461 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,242 $2,000 Not Implemented
WV0512 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $29,352 $75,000 Not Implemented
WV0512 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,537 $80 Implemented
WV0512 # 02 Y:2015 02 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,436 $500 Implemented
WV0512 # 03 Y:2015 03 2015 UPGRADE CONTROLS ON COMPRESSORS $4,536 $20,300 Not Implemented
WV0512 # 09 Y:2015 09 2015 DEVELOP A REPAIR/REPLACE POLICY $762 $554 Implemented
WV0512 # 05 Y:2015 05 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,325 $1,000 Implemented