IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
SIC 3259 Structural Clay Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0609 # 05 Y:2021 05 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $308 $920 Not Implemented
SD0609 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,216 $2,319 Not Implemented
SD0609 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,053 $225 Not Implemented
SD0609 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $821 $0 Not Implemented
SD0609 # 01 Y:2021 01 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,886 $1,396 Not Implemented
LL0325 # 02 Y:2010 02 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,692 $30 Implemented
LL0325 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,166 $595 Not Implemented
LL0325 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,019 $1,265 Implemented
LL0325 # 05 Y:2010 05 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $803 $623 Not Implemented
LL0325 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $114 $120 Not Implemented
LL0325 # 07 Y:2010 07 2010 USE PHOTOCELL CONTROLS $39 $30 Not Implemented
LL0325 # 01 Y:2010 01 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $40,139 $3,000 Implemented
SD0317 # 07 Y:2003 07 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,800 $10,000 Not Implemented
SD0317 # 06 Y:2003 06 2003 INSTALL SKYLIGHTS $1,552 $600 Not Implemented
SD0317 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,481 $4,500 Not Implemented
SD0317 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,969 $200 Not Implemented
SD0317 # 03 Y:2003 03 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $4,354 $16 Not Implemented
SD0317 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,972 $15,200 Not Implemented
SD0317 # 01 Y:2003 01 2003 UPGRADE OBSOLETE EQUIPMENT $18,680 $350 Not Implemented
UD0636 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $20,587 $7,200 Implemented
UD0636 # 03 Y:2002 03 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $20,230 $25,000 Implemented
UD0636 # 01 Y:2002 01 2002 INCREASE USE OF AUTOMATION $62,400 $0 Implemented
UD0636 # 05 Y:2002 05 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,247 $500 Implemented
UD0636 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,668 $1,185 Implemented
UD0636 # 04 Y:2002 04 2002 OPTIMIZE PLANT POWER FACTOR $4,987 $3,750 Implemented