Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
1,533
matching recommendationsSIC | 327 | Concrete, Gypsum, And Plaster Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0077 # 02 Y:1983 | 02 | 1983 | SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM | $30,320 | $0 | Implemented |
KU0077 # 03 Y:1983 | 03 | 1983 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,372 | $10,000 | Implemented |
KU0077 # 04 Y:1983 | 04 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,586 | $1,400 | Implemented |
KU0077 # 05 Y:1983 | 05 | 1983 | INSTALL AUTOMATIC STACK DAMPER | $4,345 | $912 | Implemented |
KU0077 # 06 Y:1983 | 06 | 1983 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,751 | $2,228 | Implemented |
KU0077 # 07 Y:1983 | 07 | 1983 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $2,986 | $1,142 | Implemented |
KU0077 # 08 Y:1983 | 08 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,716 | $550 | Implemented |
KU0077 # 09 Y:1983 | 09 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,426 | $6,017 | Implemented |
KU0077 # 10 Y:1983 | 10 | 1983 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $2,147 | $4,000 | Not Implemented |
KU0077 # 11 Y:1983 | 11 | 1983 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,094 | $0 | Not Implemented |
KU0077 # 12 Y:1983 | 12 | 1983 | OPTIMIZE PLANT POWER FACTOR | $1,735 | $970 | Not Implemented |
KU0077 # 13 Y:1983 | 13 | 1983 | OPTIMIZE PLANT POWER FACTOR | $747 | $540 | Not Implemented |
OK0060 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $406 | $294 | Not Implemented |
OK0060 # 02 Y:1982 | 02 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $436 | $600 | Implemented |
OK0060 # 03 Y:1982 | 03 | 1982 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $293 | $0 | Not Implemented |
OK0060 # 04 Y:1982 | 04 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $31,428 | $18,000 | Not Implemented |
OK0060 # 05 Y:1982 | 05 | 1982 | INSULATE BARE EQUIPMENT | $3,052 | $5,840 | Not Implemented |
OK0060 # 06 Y:1982 | 06 | 1982 | INSULATE BARE EQUIPMENT | $497 | $202 | Not Implemented |
OK0060 # 07 Y:1982 | 07 | 1982 | INSULATE BARE EQUIPMENT | $438 | $254 | Not Implemented |
OK0060 # 08 Y:1982 | 08 | 1982 | INSULATE BARE EQUIPMENT | $4,281 | $2,495 | Not Implemented |
UD0044 # 01 Y:1982 | 01 | 1982 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $4,962 | $2,000 | Not Implemented |
OK0036 # 01 Y:1982 | 01 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,397 | $600 | Implemented |
OK0036 # 02 Y:1982 | 02 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,757 | $140 | Implemented |
OK0036 # 03 Y:1982 | 03 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,447 | $8,375 | Implemented |
OK0036 # 04 Y:1982 | 04 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,547 | $675 | Implemented |