Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 327 Concrete, Gypsum, And Plaster Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0731 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $550 $419 Not Implemented
OR0731 # 03 Y:2020 03 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,289 $1,924 Not Implemented
OR0731 # 02 Y:2020 02 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,777 $55 Not Implemented
OR0731 # 01 Y:2020 01 2020 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $400,247 $579,059 Not Implemented
OR0713 # 06 Y:2018 06 2018 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $929 $0 Implemented
OR0713 # 05 Y:2018 05 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,108 $5,028 Implemented
OR0713 # 04 Y:2018 04 2018 UPGRADE CONTROLS ON COMPRESSORS $7,018 $26,371 Implemented
OR0713 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,594 $4,336 Implemented
OR0713 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,959 $10,959 Implemented
OR0713 # 01 Y:2018 01 2018 PURCHASE EQUIPMENT INSTEAD OF LEASING $219,819 $375,000 Not Implemented
OR0504 # 07 Y:2006 07 2006 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,500 $1,000 Not Implemented
OR0504 # 06 Y:2006 06 2006 REDESIGN PROCESS $6,100 $5,000 Not Implemented
OR0504 # 05 Y:2006 05 2006 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $23,000 $0 Implemented
OR0504 # 04 Y:2006 04 2006 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $28,000 $0 Not Implemented
OR0504 # 03 Y:2006 03 2006 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $84,100 $0 Not Implemented
OR0504 # 02 Y:2006 02 2006 REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS $22,500 $44,500 Implemented
OR0504 # 01 Y:2006 01 2006 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $64,300 $20,000 Implemented
OR0451 # 01 Y:2004 01 2004 $20,100 $3,525 Not Implemented
OR0451 # 05 Y:2004 05 2004 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $875 $300 Not Implemented
OR0451 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,828 $360 Implemented
OR0451 # 03 Y:2004 03 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,488 $0 Implemented
OR0451 # 02 Y:2004 02 2004 UPGRADE CONTROLS ON COMPRESSORS $5,370 $19,500 Not Implemented