Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
50
matching recommendationsSIC | 327 | Concrete, Gypsum, And Plaster Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0295 # 04 Y:1989 | 04 | 1989 | INSULATE BARE EQUIPMENT | $3,121 | $6,944 | Implemented |
RU0066 # 04 Y:1989 | 04 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,791 | $0 | Implemented |
RU0066 # 01 Y:1989 | 01 | 1989 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $25,758 | $105,000 | Implemented |
OK0295 # 05 Y:1989 | 05 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,523 | $704 | Implemented |
OK0295 # 03 Y:1989 | 03 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,641 | $11,362 | Implemented |
RU0066 # 03 Y:1989 | 03 | 1989 | IMPROVE LUBRICATION PRACTICES | $3,064 | $800 | Not Implemented |
OK0295 # 01 Y:1989 | 01 | 1989 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $73,916 | $54,162 | Implemented |
OK0295 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,139 | $4,563 | Implemented |
RU0066 # 02 Y:1989 | 02 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,106 | $102 | Not Implemented |
RU0066 # 05 Y:1989 | 05 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,509 | $0 | Not Implemented |
RU0066 # 06 Y:1989 | 06 | 1989 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,609 | $4,396 | Not Implemented |
RU0060 # 01 Y:1989 | 01 | 1989 | REPAIR AND ELIMINATE STEAM LEAKS | $20,786 | $0 | Implemented |
RU0060 # 05 Y:1989 | 05 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,180 | $102 | Implemented |
RU0060 # 02 Y:1989 | 02 | 1989 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $18,359 | $16,835 | Implemented |
RU0060 # 03 Y:1989 | 03 | 1989 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,856 | $6,900 | Not Implemented |
RU0060 # 04 Y:1989 | 04 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,256 | $0 | Implemented |
RU0060 # 06 Y:1989 | 06 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,072 | $1,500 | Implemented |
CO0150 # 07 Y:1989 | 07 | 1989 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $11,600 | $6,700 | Implemented |
CO0150 # 08 Y:1989 | 08 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $463 | $387 | Implemented |
CO0150 # 09 Y:1989 | 09 | 1989 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,370 | $250 | Implemented |
CO0150 # 06 Y:1989 | 06 | 1989 | INSTALL TIMERS AND/OR THERMOSTATS | $429 | $600 | Implemented |
CO0150 # 05 Y:1989 | 05 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $760 | $1,400 | Implemented |
CO0150 # 04 Y:1989 | 04 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $800 | $200 | Implemented |
CO0150 # 03 Y:1989 | 03 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $250 | $300 | Implemented |
CO0150 # 02 Y:1989 | 02 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,420 | $500 | Implemented |