IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 327 Concrete, Gypsum, And Plaster Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0133 # 09 Y:1994 09 1994 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,213 $25,250 Not Implemented
AS0133 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,311 $0 Implemented
AS0133 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,657 $20,486 Implemented
AS0133 # 03 Y:1994 03 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $491 $0 Not Implemented
AS0133 # 04 Y:1994 04 1994 USE SYNTHETIC LUBRICANT $1,459 $2,459 Implemented
AS0133 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $769 $200 Implemented
AS0133 # 06 Y:1994 06 1994 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,424 $3,000 Implemented
AS0133 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,341 $7,356 Not Implemented
AS0133 # 08 Y:1994 08 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $414 $698 Not Implemented
UF0100 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,448 $5,894 Implemented
UF0100 # 02 Y:1994 02 1994 USE PHOTOCELL CONTROLS $116 $200 Not Implemented
UF0100 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $405 $1,000 Implemented
UF0100 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,602 $7,601 Not Implemented
UF0100 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,762 $2,425 Implemented
UF0100 # 06 Y:1994 06 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,000 $7,000 Implemented
UF0100 # 07 Y:1994 07 1994 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $70,532 $52,995 Not Implemented
MA0313 # 02 Y:1994 02 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,198 $30,000 Not Implemented
MA0313 # 08 Y:1994 08 1994 REDUCE OR ELIMINATE WASTE $386 $500 Implemented
MA0313 # 07 Y:1994 07 1994 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $25,107 $30,000 Not Implemented
MA0313 # 06 Y:1994 06 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $69,505 $30,000 Implemented
MA0313 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,374 $180 Implemented
MA0313 # 04 Y:1994 04 1994 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,203 $28,535 Not Implemented
MA0313 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,706 $2,248 Implemented
MA0313 # 01 Y:1994 01 1994 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $16,573 $31,939 Not Implemented
CO0308 # 01 Y:1994 01 1994 INSULATE BARE EQUIPMENT $11,270 $18,000 Not Implemented