IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

736

matching recommendations
Reset
SIC 3272 Concrete Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0100 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,448 $5,894 Implemented
UF0100 # 02 Y:1994 02 1994 USE PHOTOCELL CONTROLS $116 $200 Not Implemented
UF0100 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $405 $1,000 Implemented
UF0100 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,602 $7,601 Not Implemented
UF0100 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,762 $2,425 Implemented
UF0100 # 06 Y:1994 06 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,000 $7,000 Implemented
UF0100 # 07 Y:1994 07 1994 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $70,532 $52,995 Not Implemented
MA0313 # 01 Y:1994 01 1994 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $16,573 $31,939 Not Implemented
MA0313 # 02 Y:1994 02 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,198 $30,000 Not Implemented
MA0313 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,706 $2,248 Implemented
MA0313 # 04 Y:1994 04 1994 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,203 $28,535 Not Implemented
MA0313 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,374 $180 Implemented
MA0313 # 06 Y:1994 06 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $69,505 $30,000 Implemented
MA0313 # 07 Y:1994 07 1994 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $25,107 $30,000 Not Implemented
MA0313 # 08 Y:1994 08 1994 REDUCE OR ELIMINATE WASTE $386 $500 Implemented
UF0074 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,092 $519 n/a
UF0074 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $458 $2,101 n/a
UF0074 # 03 Y:1993 03 1993 INSTALL OCCUPANCY SENSORS $307 $252 n/a
UF0074 # 04 Y:1993 04 1993 USE PHOTOCELL CONTROLS $350 $1,200 n/a
UF0074 # 05 Y:1993 05 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,726 $0 n/a
UF0074 # 06 Y:1993 06 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,178 $4,121 n/a
UF0074 # 07 Y:1993 07 1993 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $233 $1,000 n/a
UF0074 # 08 Y:1993 08 1993 MINIMIZE WATER USAGE $8,115 $3,050 n/a
UF0074 # 09 Y:1993 09 1993 COMBINE UTILITY METERS $226 $475 n/a
HO0046 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,845 $1,328 Implemented