IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

736

matching recommendations
Reset
SIC 3272 Concrete Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0086 # 09 Y:1987 09 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,041 $70 Implemented
CO0086 # 10 Y:1987 10 1987 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $18,372 $500 Implemented
CO0086 # 11 Y:1987 11 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $372 $869 Not Implemented
CO0086 # 12 Y:1987 12 1987 TURN OFF EQUIPMENT WHEN NOT IN USE $2,289 $700 Implemented
CO0086 # 13 Y:1987 13 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $559 $589 Not Implemented
CO0081 # 01 Y:1987 01 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,351 $200 Implemented
CO0081 # 02 Y:1987 02 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,685 $300 Implemented
CO0081 # 03 Y:1987 03 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,132 $0 Implemented
CO0081 # 04 Y:1987 04 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $4,887 $15,000 Implemented
CO0081 # 05 Y:1987 05 1987 OPTIMIZE PLANT POWER FACTOR $1,533 $3,931 Implemented
CO0081 # 06 Y:1987 06 1987 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $3,316 $0 Not Implemented
LT0053 # 01 Y:1986 01 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,910 $0 Implemented
LT0053 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $575 $0 Implemented
LT0053 # 03 Y:1986 03 1986 USE OPTIMUM THICKNESS INSULATION $11,458 $28,763 Not Implemented
LT0053 # 05 Y:1986 05 1986 REPAIR AND ELIMINATE STEAM LEAKS $2,214 $2,000 Implemented
LT0053 # 06 Y:1986 06 1986 KEEP BOILER TUBES CLEAN $1,737 $3,000 Not Implemented
LT0053 # 07 Y:1986 07 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,600 $10,000 Not Implemented
LT0053 # 08 Y:1986 08 1986 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $408 $1,000 Implemented
TN0198 # 01 Y:1984 01 1984 INSULATE BARE EQUIPMENT $3,850 $2,583 Implemented
TN0198 # 02 Y:1984 02 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $442 $589 Implemented
TN0198 # 03 Y:1984 03 1984 USE MINIMUM STEAM OPERATING PRESSURE $257 $0 Implemented
TN0198 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $0 $108 Implemented
TN0198 # 05 Y:1984 05 1984 REPAIR AND ELIMINATE STEAM LEAKS $168 $183 Implemented
KU0077 # 01 Y:1983 01 1983 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $51,514 $55,000 Implemented
KU0077 # 02 Y:1983 02 1983 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $30,320 $0 Implemented