Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1987 |
Principal Product | PRECAST CONCRETE |
NAICS | n/a |
SIC | 3272 - Concrete Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 8,078 Thousand Feet |
Production Hrs. Annual | 6,240 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $128,712 | 1,417,937 | kWh | $0.09 |
Natural Gas | $198,049 | 49,791 | MMBtu | $3.98 |
TOTAL ENERGY COSTS | $326,761 | |||
RECOMMENDED SAVINGS* | $98,890 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $80,855 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $12,235 Cost: $300 |
- | - | $12,235 | 3,074 |
- - kWh |
$12,235 3,074 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $8,294 Cost: $3,331 |
- | - | $8,294 | 2,084 |
- - kWh |
$8,294 2,084 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1222 INSTALL TURBULATORS |
Savings: $5,059 Cost: $1,700 |
- | - | $5,059 | 1,271 |
- - kWh |
$5,059 1,271 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $7,419 Cost: $16,669 |
- | - | $7,419 | 1,864 |
- - kWh |
$7,419 1,864 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $10,077 Cost: $16,800 |
- | - | $10,077 | 2,532 |
- - kWh |
$10,077 2,532 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,421 Cost: $400 |
$7,421 | 81,770 | - | - |
$7,421 81,770 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4312 IMPROVE LUBRICATION PRACTICES |
Savings: $1,968 Cost: - |
$1,968 | 21,688 | - | - |
$1,968 21,688 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $784 Cost: $200 |
- | - | $784 | 197 |
- - kWh |
$784 197 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $24,041 Cost: $70 |
$24,451 | 24,033 | $(-410) | (-103) |
$24,451 24,033 kWh |
$(-410) (-103) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION |
Savings: $18,372 Cost: $500 |
- | - | $18,372 | 4,616 |
- - kWh |
$18,372 4,616 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $372 Cost: $869 |
$372 | 4,103 | - | - |
$372 4,103 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $2,289 Cost: $700 |
- | - | $2,289 | 575 |
- - kWh |
$2,289 575 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $559 Cost: $589 |
$559 | 6,155 | - | - |
$559 6,155 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $98,890 Cost: $42,128 |
$34,771 | 137,749 | $64,119 | 16,110 | $34,771 137,749 kWh |
$64,119 16,110 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $80,855 Cost: $22,170 |
$31,872 | 105,803 | $48,983 | 12,307 | $31,872 105,803 kWh |
$48,983 12,307 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |