IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

317

matching recommendations
Reset
SIC 3273 Ready-mixed Concrete
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0102 # 07 Y:1993 07 1993 INSULATE BARE EQUIPMENT $4,374 $4,199 Implemented
AS0102 # 08 Y:1993 08 1993 INSULATE BARE EQUIPMENT $8,447 $1,104 Not Implemented
AS0102 # 09 Y:1993 09 1993 INSULATE BARE EQUIPMENT $4,056 $2,513 Not Implemented
AS0102 # 10 Y:1993 10 1993 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $52,907 $200,000 Not Implemented
AM0185 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $4,350 $10,500 Not Implemented
AM0185 # 02 Y:1993 02 1993 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,750 $0 Implemented
AM0185 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,680 $250 Implemented
AM0185 # 04 Y:1993 04 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $1,660 $0 Implemented
AM0185 # 05 Y:1993 05 1993 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,160 $320 Not Implemented
AM0185 # 06 Y:1993 06 1993 USE SYNTHETIC LUBRICANT $300 $0 Not Implemented
AS0056 # 01 Y:1992 01 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $50,496 $337,500 Not Implemented
AS0056 # 02 Y:1992 02 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $23,380 $240,000 Not Implemented
AS0056 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,081 $43,663 Not Implemented
AS0056 # 04 Y:1992 04 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,817 $0 Not Implemented
AS0056 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $514 $200 Not Implemented
AS0056 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $705 $5,815 Not Implemented
AS0056 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,887 $4,292 Not Implemented
AS0056 # 08 Y:1992 08 1992 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $994 $0 Not Implemented
AM0138 # 01 Y:1992 01 1992 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $132,770 $1,000,000 Implemented
AM0138 # 02 Y:1992 02 1992 OPTIMIZE PLANT POWER FACTOR $2,460 $640 Implemented
AM0138 # 03 Y:1992 03 1992 INSTALL SET-BACK TIMERS $940 $0 Implemented
AM0138 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,147 $2,720 Implemented
OK0348 # 01 Y:1991 01 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,500 $0 Implemented
OK0348 # 02 Y:1991 02 1991 INSTALL TIMERS AND/OR THERMOSTATS $1,267 $400 Implemented
OK0348 # 03 Y:1991 03 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $292 $0 Implemented