Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsSIC | 3273 | Ready-mixed Concrete |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0482 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,040 | $1,459 | Implemented |
AS0482 # 03 Y:2020 | 03 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,701 | $160 | Implemented |
AS0482 # 02 Y:2020 | 02 | 2020 | COMBINE UTILITY METERS | $5,394 | $416 | Not Implemented |
AS0482 # 01 Y:2020 | 01 | 2020 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $11,090 | $200 | Implemented |
AS0338 # 02 Y:2002 | 02 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $281 | $0 | Not Implemented |
AS0338 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $392 | $1,387 | Not Implemented |
AS0339 # 05 Y:2002 | 05 | 2002 | INSTALL EQUIPMENT TO MOVE PRODUCT | $40,037 | $40,000 | Not Implemented |
AS0339 # 04 Y:2002 | 04 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $113,273 | $9,000 | Implemented |
AS0339 # 03 Y:2002 | 03 | 2002 | OPTIMIZE PLANT POWER FACTOR | $45,235 | $1,540 | Not Implemented |
AS0339 # 02 Y:2002 | 02 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $286 | $314 | Implemented |
AS0339 # 01 Y:2002 | 01 | 2002 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $393 | $1,000 | Not Implemented |
AS0338 # 06 Y:2002 | 06 | 2002 | INSTALL EQUIPMENT TO MOVE PRODUCT | $20,025 | $38,900 | Not Implemented |
AS0338 # 05 Y:2002 | 05 | 2002 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $875 | $2,400 | Implemented |
AS0338 # 04 Y:2002 | 04 | 2002 | REPLACE BOILER | $1,014 | $2,300 | Not Implemented |
AS0338 # 03 Y:2002 | 03 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $395 | $1,422 | Implemented |
NV0110 # 08 Y:1998 | 08 | 1998 | RECOVER AND REUSE WASTE MATERIAL | $10,351 | $1,000 | n/a |
NV0110 # 07 Y:1998 | 07 | 1998 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $3,073 | $193 | n/a |
NV0110 # 06 Y:1998 | 06 | 1998 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $877 | $100 | n/a |
NV0110 # 05 Y:1998 | 05 | 1998 | INSTALL AUTOMATIC PACKING EQUIPMENT | $6,200 | $140 | n/a |
NV0110 # 04 Y:1998 | 04 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $721 | $2,864 | n/a |
NV0110 # 03 Y:1998 | 03 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $450 | $1,239 | n/a |
NV0110 # 02 Y:1998 | 02 | 1998 | REPLACE BOILER | $3,636 | $17,539 | n/a |
NV0110 # 01 Y:1998 | 01 | 1998 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $346 | $133 | n/a |
NV0109 # 09 Y:1998 | 09 | 1998 | INSTALL AUTOMATIC PACKING EQUIPMENT | $15,147 | $60,500 | Not Implemented |
NV0109 # 10 Y:1998 | 10 | 1998 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $120 | $150 | Implemented |