IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 3273 Ready-mixed Concrete
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0898 # 13 Y:2014 13 2014 REPLACE TREATED WATER WITH WELL / SURFACE WATER $10,867 $27,400 Not Implemented
OK0898 # 01 Y:2014 01 2014 USE RADIANT HEATER FOR SPOT HEATING $12,191 $15,000 Not Implemented
OK0898 # 02 Y:2014 02 2014 INSTALL SET-BACK TIMERS $3,689 $1,965 Not Implemented
OK0898 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,132 $1,689 Implemented
OK0898 # 04 Y:2014 04 2014 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $303 $270 Implemented
OK0898 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,300 $11,014 Not Implemented
OK0898 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,345 $5,971 Not Implemented
OK0898 # 07 Y:2014 07 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $136 $463 Implemented
OK0898 # 08 Y:2014 08 2014 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,045 $1,060 Not Implemented
OK0898 # 09 Y:2014 09 2014 INSULATE BARE EQUIPMENT $90 $178 Not Implemented
OK0898 # 10 Y:2014 10 2014 USE OPTIMUM THICKNESS INSULATION $6,545 $27,400 Implemented
OK0898 # 11 Y:2014 11 2014 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $89,952 $75,900 Not Implemented
OK0898 # 12 Y:2014 12 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $20,273 $45,000 Not Implemented
OK0348 # 05 Y:1991 05 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $132 $0 Implemented
OK0348 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $321 $759 Implemented
OK0348 # 03 Y:1991 03 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $292 $0 Implemented
OK0348 # 02 Y:1991 02 1991 INSTALL TIMERS AND/OR THERMOSTATS $1,267 $400 Implemented
OK0348 # 01 Y:1991 01 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,500 $0 Implemented
OK0324 # 04 Y:1990 04 1990 OPTIMIZE PLANT POWER FACTOR $2,799 $10,000 Not Implemented
OK0324 # 06 Y:1990 06 1990 INSTALL TIMERS AND/OR THERMOSTATS $846 $1,050 Implemented
OK0324 # 05 Y:1990 05 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,755 $32,000 Not Implemented
OK0324 # 03 Y:1990 03 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,971 $4,800 Not Implemented
OK0324 # 02 Y:1990 02 1990 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $324 $0 Implemented
OK0324 # 01 Y:1990 01 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,113 $0 Implemented
OK0221 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $98 $62 Implemented