Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 3273 | Ready-mixed Concrete |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0338 # 02 Y:2002 | 02 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $281 | $0 | Not Implemented |
AS0338 # 03 Y:2002 | 03 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $395 | $1,422 | Implemented |
AS0338 # 04 Y:2002 | 04 | 2002 | REPLACE BOILER | $1,014 | $2,300 | Not Implemented |
AS0338 # 05 Y:2002 | 05 | 2002 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $875 | $2,400 | Implemented |
AS0338 # 06 Y:2002 | 06 | 2002 | INSTALL EQUIPMENT TO MOVE PRODUCT | $20,025 | $38,900 | Not Implemented |
AS0339 # 01 Y:2002 | 01 | 2002 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $393 | $1,000 | Not Implemented |
AS0339 # 02 Y:2002 | 02 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $286 | $314 | Implemented |
AS0339 # 03 Y:2002 | 03 | 2002 | OPTIMIZE PLANT POWER FACTOR | $45,235 | $1,540 | Not Implemented |
AS0339 # 04 Y:2002 | 04 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $113,273 | $9,000 | Implemented |
AS0339 # 05 Y:2002 | 05 | 2002 | INSTALL EQUIPMENT TO MOVE PRODUCT | $40,037 | $40,000 | Not Implemented |
AS0338 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $392 | $1,387 | Not Implemented |
TA0040 # 02 Y:2002 | 02 | 2002 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,952 | $0 | Implemented |
TA0040 # 07 Y:2002 | 07 | 2002 | INSTALL OCCUPANCY SENSORS | $110 | $130 | Not Implemented |
TA0040 # 06 Y:2002 | 06 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $140 | $0 | Not Implemented |
TA0040 # 05 Y:2002 | 05 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $181 | $90 | Not Implemented |
TA0040 # 04 Y:2002 | 04 | 2002 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,210 | $0 | Not Implemented |
TA0040 # 03 Y:2002 | 03 | 2002 | INCREASE EFFICIENCY OF TRUCKS | $2,552 | $0 | Implemented |
TA0040 # 01 Y:2002 | 01 | 2002 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $11,200 | $12,425 | Implemented |
UM0212 # 01 Y:2002 | 01 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $59,075 | $182,900 | Not Implemented |
UM0212 # 02 Y:2002 | 02 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,000 | $10,035 | Not Implemented |
UM0212 # 03 Y:2002 | 03 | 2002 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $4,407 | $500 | Not Implemented |
UM0212 # 04 Y:2002 | 04 | 2002 | INSULATE BARE EQUIPMENT | $2,000 | $1,000 | Not Implemented |
UM0212 # 05 Y:2002 | 05 | 2002 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,885 | $2,786 | Not Implemented |
UM0212 # 06 Y:2002 | 06 | 2002 | OPTIMIZE PLANT POWER FACTOR | $1,270 | $3,417 | Not Implemented |