IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 3275 Gypsum Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0459 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $881 $350 Not Implemented
AS0459 # 04 Y:2018 04 2018 INSTALL TIMERS AND/OR THERMOSTATS $1,642 $3,200 Implemented
AS0459 # 03 Y:2018 03 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,682 $13,900 Not Implemented
AS0459 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,314 $280 Implemented
AS0459 # 01 Y:2018 01 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,170 $22,956 Not Implemented
AS0239 # 01 Y:1998 01 1998 USE SYNTHETIC LUBRICANT $1,810 $1,710 Not Implemented
AS0239 # 08 Y:1998 08 1998 ADOPT IN-HOUSE MATERIAL GENERATION $72,397 $325,070 Not Implemented
AS0239 # 07 Y:1998 07 1998 MINIMIZE WATER USAGE $18,668 $82,192 Not Implemented
AS0239 # 06 Y:1998 06 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $7,760 $120 Not Implemented
AS0239 # 05 Y:1998 05 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $141,705 $103,000 Not Implemented
AS0239 # 04 Y:1998 04 1998 USE OPTIMUM THICKNESS INSULATION $11,065 $3,346 Not Implemented
AS0239 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,473 $23,248 Not Implemented
AS0239 # 02 Y:1998 02 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,088 $3,600 Not Implemented
AS0099 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,057 $0 Implemented
AS0099 # 12 Y:1993 12 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $50,576 $50,000 Not Implemented
AS0099 # 11 Y:1993 11 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $198 $600 Not Implemented
AS0099 # 10 Y:1993 10 1993 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $1,614 $4,250 Not Implemented
AS0099 # 09 Y:1993 09 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,126 $0 Not Implemented
AS0099 # 08 Y:1993 08 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,581 $3,412 Implemented
AS0099 # 07 Y:1993 07 1993 USE SYNTHETIC LUBRICANT $2,881 $2,925 Not Implemented
AS0099 # 06 Y:1993 06 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,919 $900 Implemented
AS0099 # 05 Y:1993 05 1993 INSTALL OCCUPANCY SENSORS $893 $1,200 Not Implemented
AS0099 # 04 Y:1993 04 1993 USE PHOTOCELL CONTROLS $1,567 $950 Not Implemented
AS0099 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $869 $1,740 Implemented
AS0099 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $408 $324 Not Implemented