IAC Assessment: AS0099
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0099
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1993
Principal Product WALLBOARD
NAICS n/a
SIC 3275 - Gypsum Products
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 0
Annual Production 105,000 Thousand Feet
Production Hrs. Annual 5,404
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $460,913 6,016,120 kWh $0.08
Natural Gas $1,056,632 280,614 MMBtu $3.77
TOTAL ENERGY COSTS $1,517,545
RECOMMENDED SAVINGS* $76,689 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,426
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,057
Cost:
-
$1,145 14,947 $(-88) - $1,145
14,947
kWh
$(-88)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$408
Cost:
$324
$447 5,862 $(-39) - $447
5,862
kWh
$(-39)
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$869
Cost:
$1,740
$869 11,430 - - $869
11,430
kWh
-
-
$
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,567
Cost:
$950
$1,437 18,757 $130 - $1,437
18,757
kWh
$130
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$893
Cost:
$1,200
$893 11,723 - - $893
11,723
kWh
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,919
Cost:
$900
$1,919 25,205 - - $1,919
25,205
kWh
-
-
$
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,881
Cost:
$2,925
$2,137 27,843 $744 - $2,137
27,843
kWh
$744
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,581
Cost:
$3,412
$4,581 59,789 - - $4,581
59,789
kWh
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$10,126
Cost:
-
$10,126 132,181 - - $10,126
132,181
kWh
-
-
$
10: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$1,614
Cost:
$4,250
$1,614 21,102 - - $1,614
21,102
kWh
-
-
$
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$198
Cost:
$600
$198 2,638 - - $198
2,638
kWh
-
-
$
12: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$50,576
Cost:
$50,000
$50,576 506,155 - - $50,576
506,155
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$76,689
Cost:
$66,301
$75,942 837,632 $747 - $75,942
837,632
kWh
$747
-
$
TOTAL IMPLEMENTED Savings:
$8,426
Cost:
$6,052
$8,514 111,371 $(-88) - $8,514
111,371
kWh
$(-88)
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes