IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
SIC 328 Cut Stone And Stone Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0922 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,604 $3,500 Implemented
GT0922 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $6,827 $1,175 Implemented
GT0922 # 01 Y:2019 01 2019 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $8,082 $1,200 Implemented
GT0922 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $76,284 $79,761 Implemented
GT0922 # 05 Y:2019 05 2019 PAY BILLS ON TIME TO AVOID LATE FEES $281 $1,190 Implemented
GT0672 # 04 Y:1999 04 1999 FILTER AND REUSE HYDRAULIC OIL $1,950 $3,500 Not Implemented
GT0672 # 03 Y:1999 03 1999 MAINTAIN MACHINES TO REDUCE LEAKS $6,500 $5,000 Implemented
GT0672 # 02 Y:1999 02 1999 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,897 $5,660 Not Implemented
GT0672 # 01 Y:1999 01 1999 REDUCE FLUID FLOW RATES $4,090 $600 Implemented
GT0672 # 06 Y:1999 06 1999 USE POWER DURING OFF-PEAK PERIODS $32,520 $0 Implemented
GT0672 # 05 Y:1999 05 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,071 $51,281 Implemented
GT0665 # 05 Y:1999 05 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,023 $54,672 Not Implemented
GT0665 # 06 Y:1999 06 1999 USE POWER DURING OFF-PEAK PERIODS $38,560 $0 Not Implemented
GT0665 # 04 Y:1999 04 1999 $213,845 $700,000 Not Implemented
GT0665 # 02 Y:1999 02 1999 FILTER AND REUSE HYDRAULIC OIL $2,625 $3,500 Not Implemented
GT0665 # 01 Y:1999 01 1999 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,897 $5,660 Not Implemented
GT0665 # 03 Y:1999 03 1999 MAINTAIN MACHINES TO REDUCE LEAKS $6,500 $5,000 Not Implemented
GT0608 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $426 $6,227 Implemented
GT0608 # 09 Y:1997 09 1997 MAINTAIN MACHINES TO REDUCE LEAKS $6,500 $5,000 Not Implemented
GT0608 # 10 Y:1997 10 1997 REPROCESS SPENT OILS ON SITE FOR RE-USE $2,500 $9,400 Implemented
GT0608 # 01 Y:1997 01 1997 COMBINE UTILITY METERS $8,120 $18,860 Implemented
GT0608 # 08 Y:1997 08 1997 DISCONNECT BALLASTS $552 $84 Implemented
GT0608 # 07 Y:1997 07 1997 USE GRAVITY FEEDS WHEREVER POSSIBLE $2,568 $14,250 Not Implemented
GT0608 # 06 Y:1997 06 1997 USE GRAVITY FEEDS WHEREVER POSSIBLE $3,425 $5,130 Implemented
GT0608 # 05 Y:1997 05 1997 REPROCESS SPENT OILS ON SITE FOR RE-USE $2,625 $3,500 Not Implemented