IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168

matching recommendations
Reset
SIC 3281 Cut Stone And Stone Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0922 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $6,827 $1,175 Implemented
GT0922 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,604 $3,500 Implemented
GT0922 # 01 Y:2019 01 2019 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $8,082 $1,200 Implemented
GT0922 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $76,284 $79,761 Implemented
GT0922 # 05 Y:2019 05 2019 PAY BILLS ON TIME TO AVOID LATE FEES $281 $1,190 Implemented
UU0133 # 01 Y:2018 01 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $473,255 $175,000 Not Implemented
UU0133 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,825 $0 Not Implemented
UU0133 # 03 Y:2018 03 2018 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $30,169 $97,680 Not Implemented
UU0133 # 02 Y:2018 02 2018 USE POWER DURING OFF-PEAK PERIODS $206,416 $1,600 Not Implemented
UU0133 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,767 $5,679 Implemented
UU0133 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $2,849 $1,155 Implemented
TT0182 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,055 $53,270 Implemented
TT0182 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,314 $4,000 Implemented
TT0182 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,956 $5,000 Implemented
TT0182 # 06 Y:2016 06 2016 UPGRADE CONTROLS ON COMPRESSORS $6,416 $19,000 Implemented
TT0182 # 10 Y:2016 10 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $836 $600 Implemented
TT0182 # 01 Y:2016 01 2016 INSULATE BARE EQUIPMENT $13,618 $20,200 Not Implemented
TT0182 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $12,836 $61,050 Not Implemented
TT0182 # 07 Y:2016 07 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,896 $3,000 Not Implemented
TT0182 # 08 Y:2016 08 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,822 $1,500 Implemented
TT0182 # 09 Y:2016 09 2016 INSTALL TIMERS AND/OR THERMOSTATS $1,612 $500 Implemented
TT0161 # 03 Y:2015 03 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,126 $10,000 Not Implemented
TT0161 # 04 Y:2015 04 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $19,704 $2,000 Not Implemented
TT0161 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,583 $1,140 Not Implemented
TT0161 # 08 Y:2015 08 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,785 $300 Not Implemented