Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,280
matching recommendationsSIC | 329 | Misc. Nonmetallic Mineral Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2411 # 05 Y:2024 | 05 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,372 | $5,000 | n/a |
UL2411 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,717 | $1,995 | n/a |
UL2411 # 02 Y:2024 | 02 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $746 | $2,700 | n/a |
UL2411 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $76,606 | $698,579 | n/a |
UL2411 # 04 Y:2024 | 04 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $4,053 | $13,653 | n/a |
UL2411 # 06 Y:2024 | 06 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $35,308 | $50,000 | n/a |
UA0288 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $290,423 | $2,558,734 | n/a |
UA0288 # 05 Y:2024 | 05 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,178 | $10,450 | n/a |
UA0288 # 08 Y:2024 | 08 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,656 | $994 | n/a |
UA0288 # 03 Y:2024 | 03 | 2024 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,549 | $1,031 | n/a |
UA0288 # 01 Y:2024 | 01 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,634 | $1,046 | n/a |
UA0288 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,645 | $1,000 | n/a |
UA0288 # 06 Y:2024 | 06 | 2024 | OPTIMIZE PLANT POWER FACTOR | $8,607 | $5,049 | n/a |
UA0288 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,987 | $8,591 | n/a |
UA0288 # 09 Y:2024 | 09 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,856 | $4,621 | n/a |
SU0546 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,466 | $100 | n/a |
SU0546 # 01 Y:2023 | 01 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,882 | $0 | n/a |
SU0546 # 04 Y:2023 | 04 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $559 | $253 | n/a |
SU0546 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $626 | $0 | n/a |
NT0012 # 05 Y:2023 | 05 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $335 | $0 | Not Implemented |
NT0012 # 04 Y:2023 | 04 | 2023 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $13,612 | $0 | Not Implemented |
NT0012 # 06 Y:2023 | 06 | 2023 | REDUCE SCRAP PRODUCTION | $80,000 | $20,000 | Not Implemented |
NT0012 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,463 | $4,553 | Not Implemented |
NT0012 # 03 Y:2023 | 03 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $315 | $200 | Not Implemented |
NT0012 # 02 Y:2023 | 02 | 2023 | OPTIMIZE PLANT POWER FACTOR | $4,568 | $1,441 | Not Implemented |