IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

611

matching recommendations
Reset
SIC 329 Misc. Nonmetallic Mineral Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0635 # 11 Y:2022 11 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $57 $88 Implemented
WV0635 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,309 $218 Implemented
WV0635 # 07 Y:2022 07 2022 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,027 $394 Implemented
WV0635 # 10 Y:2022 10 2022 DEVELOP A REPAIR/REPLACE POLICY $546 $1,571 Implemented
WV0635 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,990 $4,945 Implemented
WV0635 # 08 Y:2022 08 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $949 $525 Implemented
WV0635 # 09 Y:2022 09 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $672 $1,500 Implemented
MA0838 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,687 $6,969 Implemented
MA0838 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,385 $65,000 Implemented
MA0838 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $1,706 $250 Implemented
MA0838 # 02 Y:2022 02 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,878 $6,206 Implemented
MA0838 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,501 $500 Implemented
SU0505 # 03 Y:2021 03 2021 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,333 $79 Implemented
SU0505 # 01 Y:2021 01 2021 DISCONNECT BALLASTS $59 $0 Implemented
SU0505 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $194 $0 Implemented
SU0505 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $75 $108 Implemented
CW0116 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $138 $90 Implemented
CW0116 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $46 $0 Implemented
CW0116 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $752 $70 Implemented
CW0116 # 07 Y:2020 07 2020 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $438 $0 Implemented
WV0594 # 09 Y:2020 09 2020 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,851 $1,500 Implemented
WV0594 # 03 Y:2020 03 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $54,583 $3,500 Implemented
WV0594 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $18,093 $41,800 Implemented
WV0594 # 11 Y:2020 11 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $703 $896 Implemented
WV0594 # 04 Y:2020 04 2020 UPGRADE CONTROLS ON COMPRESSORS $46,633 $20,450 Implemented