IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

80

matching recommendations
Reset
SIC 329 Misc. Nonmetallic Mineral Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0635 # 08 Y:2022 08 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $949 $525 Implemented
WV0635 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,990 $4,945 Implemented
WV0635 # 05 Y:2022 05 2022 INSTALL SET-BACK TIMERS $3,167 $1,125 Not Implemented
WV0635 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,179 $6,500 Not Implemented
WV0635 # 02 Y:2022 02 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $4,325 $5,360 Not Implemented
WV0635 # 07 Y:2022 07 2022 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,027 $394 Implemented
WV0635 # 09 Y:2022 09 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $672 $1,500 Implemented
WV0635 # 11 Y:2022 11 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $57 $88 Implemented
WV0635 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,309 $218 Implemented
WV0635 # 10 Y:2022 10 2022 DEVELOP A REPAIR/REPLACE POLICY $546 $1,571 Implemented
WV0635 # 04 Y:2022 04 2022 UPGRADE CONTROLS ON COMPRESSORS $3,209 $6,354 Not Implemented
WV0594 # 09 Y:2020 09 2020 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,851 $1,500 Implemented
WV0594 # 10 Y:2020 10 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,131 $0 Not Implemented
WV0594 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,704 $1,950 Implemented
WV0594 # 11 Y:2020 11 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $703 $896 Implemented
WV0594 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,869 $90 Implemented
WV0594 # 06 Y:2020 06 2020 DEVELOP A REPAIR/REPLACE POLICY $17,638 $2,295 Implemented
WV0594 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $18,093 $41,800 Implemented
WV0594 # 04 Y:2020 04 2020 UPGRADE CONTROLS ON COMPRESSORS $46,633 $20,450 Implemented
WV0594 # 02 Y:2020 02 2020 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $94,912 $539,790 Not Implemented
WV0594 # 01 Y:2020 01 2020 PREHEAT COMBUSTION AIR WITH WASTE HEAT $126,819 $150,000 Not Implemented
WV0594 # 03 Y:2020 03 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $54,583 $3,500 Implemented
WV0554 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,731 $32,581 Not Implemented
WV0554 # 10 Y:2018 10 2018 INSTALL SET-BACK TIMERS $974 $2,132 Not Implemented
WV0554 # 11 Y:2018 11 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $424 $133 Implemented