IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 329 Misc. Nonmetallic Mineral Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0519 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,572 $1,500 Implemented
SD0519 # 05 Y:2015 05 2015 INSTALL TIMERS AND/OR THERMOSTATS $3,856 $210 Implemented
SD0519 # 04 Y:2015 04 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,983 $16,500 Implemented
SD0519 # 02 Y:2015 02 2015 USE POWER DURING OFF-PEAK PERIODS $15,251 $10,325 Implemented
SD0519 # 01 Y:2015 01 2015 UPGRADE CONTROLS ON COMPRESSORS $15,876 $6,475 Implemented
SD0257 # 02 Y:2000 02 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,676 $27,000 Implemented
SD0257 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,428 $6,300 Implemented
SD0257 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $5,271 $3,000 Implemented
SD0257 # 05 Y:2000 05 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,428 $5,400 Implemented
SD0257 # 06 Y:2000 06 2000 RECYCLE CLEANING SOLVENT AND REUSE $2,345 $0 Implemented
SD0257 # 07 Y:2000 07 2000 RECOVER AND REUSE COOLING WATER $7,795 $2,000 Implemented
SD0257 # 08 Y:2000 08 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,760 $0 Implemented
SD0257 # 09 Y:2000 09 2000 $67,234 $55,000 Implemented
NV0083 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $536 $330 Implemented
NV0083 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,066 $150 Implemented
SF0016 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $39,338 $33,934 Implemented
SF0016 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,487 $6,576 Implemented
SF0016 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $5,124 $854 Implemented
SF0016 # 06 Y:1994 06 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,290 $0 Implemented
SF0016 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $24,584 $57,981 Implemented
SD0037 # 08 Y:1992 08 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,977 $1,740 Implemented
SD0037 # 06 Y:1992 06 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $566 $20 Implemented
SD0037 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $943 $4,020 Implemented