IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
SIC 329 Misc. Nonmetallic Mineral Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0447 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,286 $680 Not Implemented
UF0447 # 01 Y:2011 01 2011 INSULATE BARE EQUIPMENT $12,701 $6,982 Not Implemented
UF0447 # 02 Y:2011 02 2011 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $455 $985 Not Implemented
UF0447 # 08 Y:2011 08 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,428 $19,015 Not Implemented
UF0447 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,292 $12,615 Not Implemented
UF0447 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $125 $120 Not Implemented
UF0447 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,042 $0 Not Implemented
UF0447 # 04 Y:2011 04 2011 USE PHOTOCELL CONTROLS $439 $147 Not Implemented
MI0190 # 02 Y:2010 02 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,171 $2,804 Not Implemented
MI0190 # 05 Y:2010 05 2010 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,758 $4,871 Not Implemented
MI0190 # 04 Y:2010 04 2010 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $2,587 $700 Not Implemented
MI0190 # 01 Y:2010 01 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,345 $1,020 Implemented
MI0190 # 03 Y:2010 03 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,721 $2,507 Implemented
UF0278 # 04 Y:2001 04 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $56,760 $143,877 Implemented
UF0278 # 10 Y:2001 10 2001 $111,602 $1,600 Not Implemented
UF0278 # 08 Y:2001 08 2001 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,102 $20,000 Not Implemented
UF0278 # 09 Y:2001 09 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $682 $1,895 Not Implemented
UF0278 # 06 Y:2001 06 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $26,575 $46,800 Not Implemented
UF0278 # 07 Y:2001 07 2001 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $191,133 $282,000 Not Implemented
UF0278 # 05 Y:2001 05 2001 OPTIMIZE PLANT POWER FACTOR $19,545 $36,000 Not Implemented
UF0278 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190,612 $67,472 Implemented
UF0278 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $703 $621 Implemented
UF0278 # 01 Y:2001 01 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $46,074 $2,910 Not Implemented
UF0269 # 08 Y:2001 08 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $316 $1,895 Implemented
UF0269 # 09 Y:2001 09 2001 $10,697 $0 Not Implemented