Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
43
matching recommendationsSIC | 329 | Misc. Nonmetallic Mineral Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0447 # 07 Y:2011 | 07 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,286 | $680 | Not Implemented |
UF0447 # 01 Y:2011 | 01 | 2011 | INSULATE BARE EQUIPMENT | $12,701 | $6,982 | Not Implemented |
UF0447 # 02 Y:2011 | 02 | 2011 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $455 | $985 | Not Implemented |
UF0447 # 08 Y:2011 | 08 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,428 | $19,015 | Not Implemented |
UF0447 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,292 | $12,615 | Not Implemented |
UF0447 # 05 Y:2011 | 05 | 2011 | INSTALL OCCUPANCY SENSORS | $125 | $120 | Not Implemented |
UF0447 # 06 Y:2011 | 06 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,042 | $0 | Not Implemented |
UF0447 # 04 Y:2011 | 04 | 2011 | USE PHOTOCELL CONTROLS | $439 | $147 | Not Implemented |
MI0190 # 02 Y:2010 | 02 | 2010 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $4,171 | $2,804 | Not Implemented |
MI0190 # 05 Y:2010 | 05 | 2010 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $1,758 | $4,871 | Not Implemented |
MI0190 # 04 Y:2010 | 04 | 2010 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $2,587 | $700 | Not Implemented |
MI0190 # 01 Y:2010 | 01 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,345 | $1,020 | Implemented |
MI0190 # 03 Y:2010 | 03 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,721 | $2,507 | Implemented |
UF0278 # 04 Y:2001 | 04 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $56,760 | $143,877 | Implemented |
UF0278 # 10 Y:2001 | 10 | 2001 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $111,602 | $1,600 | Not Implemented |
UF0278 # 08 Y:2001 | 08 | 2001 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $5,102 | $20,000 | Not Implemented |
UF0278 # 09 Y:2001 | 09 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $682 | $1,895 | Not Implemented |
UF0278 # 06 Y:2001 | 06 | 2001 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $26,575 | $46,800 | Not Implemented |
UF0278 # 07 Y:2001 | 07 | 2001 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $191,133 | $282,000 | Not Implemented |
UF0278 # 05 Y:2001 | 05 | 2001 | OPTIMIZE PLANT POWER FACTOR | $19,545 | $36,000 | Not Implemented |
UF0278 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $190,612 | $67,472 | Implemented |
UF0278 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $703 | $621 | Implemented |
UF0278 # 01 Y:2001 | 01 | 2001 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $46,074 | $2,910 | Not Implemented |
UF0269 # 08 Y:2001 | 08 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $316 | $1,895 | Implemented |
UF0269 # 09 Y:2001 | 09 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $10,697 | $0 | Not Implemented |