Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
53
matching recommendationsSIC | 329 | Misc. Nonmetallic Mineral Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0133 # 04 Y:2007 | 04 | 2007 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $20,000 | $0 | Implemented |
IC0133 # 02 Y:2007 | 02 | 2007 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $22,188 | $0 | Implemented |
IC0133 # 03 Y:2007 | 03 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,116 | $22,551 | Not Implemented |
IC0133 # 01 Y:2007 | 01 | 2007 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $181,608 | $3,876 | Not Implemented |
IC0028 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,084 | $1,600 | Not Implemented |
IC0028 # 06 Y:2002 | 06 | 2002 | MODIFY WORKLOAD | $29,190 | $29,765 | Not Implemented |
IC0028 # 05 Y:2002 | 05 | 2002 | INSTALL OCCUPANCY SENSORS | $746 | $1,370 | Not Implemented |
IC0028 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,993 | $26,387 | Not Implemented |
IC0028 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,369 | $4,933 | Not Implemented |
IC0028 # 02 Y:2002 | 02 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $624 | $0 | Not Implemented |
WI0365 # 03 Y:2000 | 03 | 2000 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $8,830 | $26,500 | Implemented |
WI0365 # 07 Y:2000 | 07 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,922 | $600 | Implemented |
WI0365 # 06 Y:2000 | 06 | 2000 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,168 | $7,500 | Implemented |
WI0365 # 05 Y:2000 | 05 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,017 | $0 | Implemented |
WI0365 # 04 Y:2000 | 04 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,131 | $5,808 | Implemented |
WI0365 # 02 Y:2000 | 02 | 2000 | INSTALL SENSORS TO DETECT DEFECTS | $100,000 | $70,000 | Not Implemented |
WI0365 # 01 Y:2000 | 01 | 2000 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $302,692 | $770,000 | Not Implemented |
BD0085 # 03 Y:1997 | 03 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,828 | $9,330 | Implemented |
BD0085 # 01 Y:1997 | 01 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,667 | $6,050 | Not Implemented |
BD0085 # 05 Y:1997 | 05 | 1997 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $517 | $250 | Not Implemented |
BD0085 # 07 Y:1997 | 07 | 1997 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $9,491 | $1,000 | Implemented |
BD0085 # 02 Y:1997 | 02 | 1997 | INSTALL AUTOMATIC STACK DAMPER | $5,587 | $1,750 | Not Implemented |
BD0085 # 08 Y:1997 | 08 | 1997 | MINIMIZE WATER USAGE | $532 | $805 | Not Implemented |
BD0085 # 04 Y:1997 | 04 | 1997 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,772 | $300 | Not Implemented |
BD0085 # 06 Y:1997 | 06 | 1997 | INSTALL OCCUPANCY SENSORS | $745 | $975 | Not Implemented |