Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
43
matching recommendationsSIC | 329 | Misc. Nonmetallic Mineral Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0838 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,687 | $6,969 | Implemented |
MA0838 # 04 Y:2022 | 04 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,501 | $500 | Implemented |
MA0838 # 03 Y:2022 | 03 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $13,385 | $65,000 | Implemented |
MA0838 # 06 Y:2022 | 06 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,706 | $250 | Implemented |
MA0838 # 01 Y:2022 | 01 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $32,666 | $1,500 | Not Implemented |
MA0838 # 02 Y:2022 | 02 | 2022 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $13,878 | $6,206 | Implemented |
MA0700 # 01 Y:2012 | 01 | 2012 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $16,572 | $12,830 | Not Implemented |
MA0700 # 06 Y:2012 | 06 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,148 | $500 | Implemented |
MA0700 # 07 Y:2012 | 07 | 2012 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $913 | $500 | Implemented |
MA0700 # 04 Y:2012 | 04 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,265 | $500 | Implemented |
MA0700 # 05 Y:2012 | 05 | 2012 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,934 | $500 | Implemented |
MA0700 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,586 | $24,280 | Implemented |
MA0700 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,503 | $500 | Implemented |
MA0584 # 02 Y:2005 | 02 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,880 | $2,800 | Implemented |
MA0584 # 05 Y:2005 | 05 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,098 | $9,400 | Not Implemented |
MA0584 # 04 Y:2005 | 04 | 2005 | INSULATE BARE EQUIPMENT | $2,152 | $1,400 | Implemented |
MA0584 # 03 Y:2005 | 03 | 2005 | USE RADIANT HEATER FOR SPOT HEATING | $3,727 | $11,326 | Not Implemented |
MA0584 # 01 Y:2005 | 01 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,369 | $2,100 | Implemented |
MA0524 # 07 Y:2002 | 07 | 2002 | INSULATE BARE EQUIPMENT | $179 | $750 | Implemented |
MA0524 # 06 Y:2002 | 06 | 2002 | INSULATE BARE EQUIPMENT | $501 | $158 | Implemented |
MA0524 # 05 Y:2002 | 05 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,117 | $2,000 | Implemented |
MA0524 # 04 Y:2002 | 04 | 2002 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $3,719 | $13,000 | n/a |
MA0524 # 03 Y:2002 | 03 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,776 | $16,000 | n/a |
MA0524 # 02 Y:2002 | 02 | 2002 | ADOPT IN-HOUSE MATERIAL GENERATION | $14,755 | $45,000 | Not Implemented |
MA0524 # 01 Y:2002 | 01 | 2002 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $31,997 | $0 | Not Implemented |