Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
17
matching recommendationsSIC | 329 | Misc. Nonmetallic Mineral Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0180 # 04 Y:2001 | 04 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $54,000 | $16,000 | Implemented |
UM0180 # 03 Y:2001 | 03 | 2001 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $6,580 | $950 | Implemented |
UM0180 # 02 Y:2001 | 02 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,120 | $2,100 | Implemented |
UM0180 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,540 | $750 | Implemented |
UM0144 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $647 | $1,000 | Implemented |
UM0144 # 07 Y:1999 | 07 | 1999 | INSTALL SYSTEM TO COLLECT SCRAP | $7,680 | $584 | Implemented |
UM0144 # 06 Y:1999 | 06 | 1999 | REDUCE SCRAP PRODUCTION | $29,091 | $5,000 | Implemented |
UM0144 # 05 Y:1999 | 05 | 1999 | USE OPTIMUM THICKNESS INSULATION | $1,848 | $2,100 | Not Implemented |
UM0144 # 04 Y:1999 | 04 | 1999 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $5,837 | $9,350 | Not Implemented |
UM0144 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,285 | $350 | Implemented |
UM0144 # 01 Y:1999 | 01 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,661 | $110 | Implemented |
UM0130 # 01 Y:1999 | 01 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $662 | $0 | Not Implemented |
UM0130 # 02 Y:1999 | 02 | 1999 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,970 | $0 | Implemented |
UM0130 # 03 Y:1999 | 03 | 1999 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $1,200 | $3,500 | Not Implemented |
UM0130 # 04 Y:1999 | 04 | 1999 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $11,820 | $0 | Implemented |
UM0130 # 05 Y:1999 | 05 | 1999 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $3,807 | $0 | Not Implemented |
UM0130 # 06 Y:1999 | 06 | 1999 | EXPAND OPERATIONS INTO UNUSED SPACE | $65,700 | $123,450 | Not Implemented |