IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 329 Misc. Nonmetallic Mineral Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0496 # 02 Y:2020 02 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,682 $0 Not Implemented
LE0496 # 03 Y:2020 03 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,482 $3,000 Not Implemented
LE0496 # 04 Y:2020 04 2020 RECOVER WASTE HEAT FROM EQUIPMENT $3,545 $5,000 Not Implemented
LE0496 # 05 Y:2020 05 2020 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $1,393 $3,150 Not Implemented
LE0496 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,207 $3,300 Not Implemented
LE0496 # 07 Y:2020 07 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,578 $29,000 Not Implemented
LE0496 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,991 $9,200 Not Implemented
LE0496 # 09 Y:2020 09 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,150 $18,250 Not Implemented
LE0496 # 01 Y:2020 01 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $30,000 $0 Not Implemented
DL0125 # 01 Y:2014 01 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $49,900 $5,000 Implemented
DL0125 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,400 $4,500 Implemented
DL0125 # 03 Y:2014 03 2014 IMPROVE COMBUSTION CONTROL CAPABILITY $43,100 $100 Not Implemented
DL0125 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,500 $1,500 Implemented
DL0125 # 06 Y:2014 06 2014 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $5,900 $100 Not Implemented
DL0125 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,000 $10,600 Not Implemented
DL0125 # 09 Y:2014 09 2014 RECOVER WASTE HEAT FROM EQUIPMENT $6,400 $7,500 Not Implemented
DL0125 # 10 Y:2014 10 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $36,000 $126,000 Not Implemented
DL0125 # 08 Y:2014 08 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,500 $3,000 Not Implemented
DL0125 # 05 Y:2014 05 2014 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $18,400 $5,000 Not Implemented
DL0048 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $25,056 $100 Not Implemented
DL0048 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,459 $100 Implemented
DL0048 # 03 Y:2010 03 2010 INSTALL TIMERS AND/OR THERMOSTATS $6,420 $112 Implemented
DL0048 # 04 Y:2010 04 2010 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,452 $1,310 Not Implemented
DL0048 # 05 Y:2010 05 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,596 $0 Implemented
DL0048 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $1,760 $1,050 Not Implemented